Datalogic SG4 FIELDBUS Series Скачать руководство пользователя страница 4

Continue with the following steps to switch from condition 2 to condition 1: 
1.  Keep the receiver in a steady position and regulate the emitter until the yellow LED (

 SYNC) is OFF. This condition 

shows the effective alignment of the first synchronization beam. 

2.  Rotate the emitter, pivoting on the lower optics axis, until the yellow LED (

 LAST) is OFF. Under these conditions, 

if no other beam is intercepted Alignment LED (

) should turn GREEN. 

3.  Delimit the area in which the LED 

 is steady GREEN through some micro adjustments - for the first and then for 

the second unit - then place both units in the centre of this area. 
 

 
 
 

  Fix the two units firmly using brackets. 

 

 Verify that the green LED on the RX unit is ON (

) and beams are not interrupted, then verify that the red 

LED turns ON if even one single beam is interrupted (condition where an object has been detected). 

  This verification shall be made with the special cylindrical “Test Piece” having a size suitable to the resolution of the 

device used. 

 
 

A daily test is recommended. 
 
 

DEVICE DESCRIPTION FILE 

Importing device in B&R automation studio

 

 
In order to make the light curtain available in Automation Studio it’s necessary to import the description files in Automation 
Studio. 
1.  Select Tools -> Import Fieldbus Device 

 

 

Step 1 - Importing the device 

 
 
 
 
 
 
 
 

 

Ensure that the green LED 

  is steady ON. 

 

Passing the Test Piece along the whole sensitive area and at any distance from the two 
units, the red LED (

) shall be always ON and never change status. 

Содержание SG4 FIELDBUS Series

Страница 1: ...ns for the correct functioning before powering the light curtain Precautions to be observed for the choice and installation of the device Make sure that the protection level assured by the SG4 device...

Страница 2: ...CONNECTOR 1 24VDC BROWN 2 NOT USED WHITE 3 0 VDC BLUE 4 NOT USED BLACK CN2 SIGNAL ETHERNET POWERLINK PORT1 1 TxD transmit data 2 RxD receive data 3 TxD transmit data 4 RxD receive data CN3 SIGNAL ETH...

Страница 3: ...dard installation described hereinafter is the one shown in figure with the bar assembled with the connectors pointing down Two yellow LEDs LAST SYNC on receiver unit facilitate the alignment procedur...

Страница 4: ...ly using brackets Verify that the green LED on the RX unit is ON and beams are not interrupted then verify that the red LED turns ON if even one single beam is interrupted condition where an object ha...

Страница 5: ...OP B xosdd Advanced up to 600mm SG4 xx xxx OP A 150 600 FFFF000D SG4 14_30 15_60 OP A xdd SG4 14_30 15_60 OP A xosdd Advanced from 750mm to 1800mm SG4 xx xxx OP A 750 1800 FFFF000D SG4 14_30 75_180 OP...

Страница 6: ...click on SG4 FIELDBUS device and select Change node number set the address from 1 to 240 Select EPL device address in AutomationStudio On device choose same address by setting the two rotary switches...

Страница 7: ...ot aligned M Red MASTER uP STATUS OFF Normal operation Blinking ON Error ON uP MASTER Boot Pre op S Red SLAVE uP STATUS see LED S ON Error ON uP SLAVE P Red Green ETHERNET POWERLINK STATUS Green ON no...

Страница 8: ...t regarding the final installation Warning This is a Class A product In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measure...

Отзывы: