Ahiba IR User's Guide
Appendix
•
39
Maintenance List
Below is a routine maintenance checklist and schedule of tasks that should be
performed to insure the proper operation of the unit.
Machine Part/
Procedure
Party Responsible
for Maintenance
Every
Cycle
Quarterly
Yearly
Accessories
Wash beakers, beaker
lids, and dosing
accessories thoroughly.
Flush nipples with clean,
warm water..
User
x
Machine
Keep the interior surfaces
clean and shiny in order
to maximize reflection.
User
x
Dyeing Beaker
Check for leaks.
Replace O-ring if
necessary.
User
x
Drive
Check belts and listen for
drive noise.
If necessary, adjust or
replace belts
Datacolor Service
x
Speed of the Drive
Check and calibrate, if
necessary.
Tolerance =
±
2 rpm.
Datacolor Service
x
Temperature
Calibration
Check the temperature
calibration and adjust if
necessary.
Tolerance
±
1°C
NOTE: Contact Datacolor
Service personnel to
complete this check.
Datacolor Service
personnel
x
Gradient Test
Test and ensure
maximum achievable
gradient is within
tolerance. Make repairs
as needed.
Datacolor Service
personnel
x
Содержание AHIBA IR
Страница 2: ......
Страница 4: ......
Страница 26: ...20 Equipment Controls and Indicators Ahiba IR User s Guide N O T E S ...
Страница 34: ...28 Program Controls Ahiba IR User s Guide N O T E S ...
Страница 50: ...44 Appendix Ahiba IR User s Guide N O T ES ...