background image

Installation and Setup Guide

DATA DOMAIN DD690g GATEWAY SYSTEM

1.  Unpack the Data Domain system.

 

A system consists of a DD690g 

controller that communicates with the external disk array. Up to 35.5 TB 
of external usable storage is supported.
A Data Domain gateway system needs to be 1) installed, 2) connected to 
the external storage, and 3) configured to use this storage.

Open the packing boxes for the system.

Remove the accessories and rack mount kits for all system components.

2.  Install the appropriate rack mounting hardware

 for the system 

into a 19-inch, four-post rack. Ensure that the rack is anchored to prevent 
tipping. Load the rack or cabinet beginning at the bottom to prevent the 
rack from becoming top-heavy. Be sure to plan appropriate vertical space 
to accommodate the 2U system. 

See the instructions included with the slide rails. See Figure 1.

3.  Install the controller in the rack in a horizontal position.

Remove the system from the shipping boxes.

Remove the bezel from the Data Domain system.

Install the Data Domain system on the corresponding slide rails and 
slide in the rack. Be sure one person is at each side of the system to 
guide it into the rail ends. 

Secure the system in the rack with the thumb screws.

4.  Install the third-party external storage

, following the instruc-

tions that accompanied the product.

5.  Connect and configure storage. 

There are two connectivity 

options: Fibre Channel direct-attached and Fibre Channel SAN-attached. 
See the 

External Storage Configuration

 section.

6.  Connect an administrative console.

 Attach a 9-pin serial console 

to the controller’s serial port, or attach a Cat 5e or Cat 6 Ethernet cable 
to an Ethernet port (DHCP required), or use a monitor (VGA port) and 
keyboard (keyboard/purple icon), or use KVM. See Figure 2.

7.  Enable data transfer connectivity. 

Repeat for each connection. 

Ethernet connection:

 If using 1 Gb copper Ethernet, attach a Cat 

5e or Cat 6 copper Ethernet cable to an RJ45 Ethernet network port 
(start with eth0 and go up) on the system, and attach the other end 
to an Ethernet switch or to an Ethernet port on your server. If using 
gigabit fiber Ethernet, use multimode fiber cables with LC connectors.
If using 10 Gb copper Ethernet with a CX4 connector, use an IEEE draft 
standard 802.3ak / D5.3 compliant cable or a Data Domain CX4 cable. 
Not all CX4 cables qualify. If using 10 Gb fiber Ethernet, use MMF-
850nm cables with LC duplex connectors. See Figure 2.

Fibre Channel connection:

 Attach a Fibre Channel fiber optical cable 

(LC connector) to a VTL HBA port on the system, and attach the other 
end (LC connector) to a Fibre Channel switch or to a Fibre Channel 
port on your server. See Figure 2 for PCI slot locations for VTL cards.

8.  Provide redundant power to the system. 

Connect power cables 

to both receptacles and set the power cable retention clips. See Figure 2.

9.  Turn the system on. 

Note: 

Third-party SAN storage attached to the DD690g must be zoned 

before you power on the Data Domain system.

Attach the bezel.

10. Collect the information needed for installation.

 Enter the 

information in section 2, 

Define the Data Domain System Information for 

Your Site

, found to the far right.

 

Install Hardware

1

The steps for a complete installation and configuration are:

1. 

Install Hardware

2. 

Define the Data Domain system information for your site

3. 

Perform initial system configuration

5. 

Configure the system for data access

6. 

Configure optional software

7. 

Perform optional additional system configuration

Installation and Setup Steps

1

5

4

3

2

6

All plug-in modules and blank plates are part of the 
fire enclosure and must be removed only when a 
replacement can be added immediately. The system 
must not be run without all parts in place.

A system must be operated only from a power 
supply input voltage range of 100–240 VAC, 
50–60 Hz.

A Data Domain system is intended to operate 
with two working power supplies installed. 

Provide a suitable power source with electrical 
overload protection.

A safe electrical earth connection must be pro-
vided to the power cord. Check the grounding 
of the power sources before applying power.

The plug on each power supply cord is used 
as the main disconnect device. Ensure that the 
socket outlets are located near the equipment 
and are easily accessible.

Permanently unplug the unit if you think it is 
damaged in any way and before moving it. If 
the unit is powered by multiple sources, discon-
nect all supplied power for complete isolation.

The power connections must always be 
disconnected prior to removal or replacement 
of a power supply module from any of the 
components in the system.

A faulty power supply module must be replaced 
within 24 hours.

Do not lift system components by yourself. A 
system weighs 51 lbs (23 kg). 

To comply with applicable safety, emission, 
and thermal requirements, covers must not  
be removed and all bays must be fitted with 
plug-in modules.

Load the payload into the rack beginning at 
the bottom to prevent the rack from becoming 
top-heavy.

Do not extend components on slide rails until 
you have loaded at least three or more similarly 
weighted items in the rack, or unless the rack 
is bolted to the floor or overhead structure to 
prevent tipping.

Warning: 

When the system is in normal use, the sys-

tem controller top cover must be secured by rotating 
the lock 90° to the locked position to prevent users 
or operators from accessing the service areas.

Caution: 

If the system is used in a manner not speci-

fied by the manufacturer, the protection provided by 
the equipment may be impaired.

Caution: 

The RJ45 sockets on the motherboard/PCI 

cards are for Ethernet connection only and must not 
be connected to a telecommunications network.

ESD PrEcAuTIONS

Data Domain recommends that you fit and check a 
suitable anti-static wrist or ankle strap and observe 
all conventional ESD precautions when handling 
plug-in modules and components.

Safety

Содержание DD690g

Страница 1: ...Turn the system on Note Third party SAN storage attached to the DD690g must be zoned before you power on the Data Domain system Attach the bezel 10 Collect the information needed for installation Enter the information in section 2 Define the Data Domain System Information for Your Site found to the far right Install Hardware 1 The steps for a complete installation and configuration are 1 Install H...

Страница 2: ...Operator Panel LEDs LED Status Power Active Steady Green Good Unit Fault Steady Amber Fault Enclosure ID Blue Only when activated 3 9 4 10 7 11 8 12 1 1 1 2 1 2 5 1 3 6 1 4 Front Operator Panel Buttons Push Button Definition Power Press to start boot if system is not running Never shut down the system by pressing the power button System Reset Resets hardware and firmware Use ballpoint pen to activ...

Страница 3: ...way system by the third party external storage connect external storage The Data Domain gateway system can be direct attached to the External Storage Array as in Figure 4 or Fibre Channel FC SAN attached as in Figure 5 A DD690g gateway system has two dual port FC Host Bus Adapters HBAs The first HBA card port is located in PCI e slot 2 and the second in PCI e slot 1 on the rear panel See Figure 2 ...

Страница 4: ...el Delete all new values and go to the next section 4 Retry Restart the input entry at the beginning of the current section The value entered previously appears as the default value at each prompt CONFIGURE THE LUNS 4 Use the disk show hardware command to find out the size of each LUN 4 Use the disk show raid info command to check which LUNs are available 4 Use disk add dev to put a LUN into use b...

Страница 5: ...pecific Data Domain Integration Documentation at https my datadomain com US en integration jsp CIFS The CIFS configuration section in the Perform Initial System Configuration section sets up the CIFS clients to allow access to backup on the Data Domain system You need to set up the CIFS clients as well to allow access to backup on the Data Domain system For additional configuration informa tion se...

Страница 6: ...ensure adequate airflow for cooling Front Bezel Clearance 1 56 inches 4 0 cm of unobstructed clearance Back Panel Clearance 5 inches 12 7 cm of unobstructed clearance Power Grounding Two AC power outlets with an earth ground conductor safety ground A safe electrical earth connection must be provided to each power cord Voltage 100 120 V or 200 240 V Frequency 50 to 60 Hz Site Requirements For infor...

Отзывы: