![Data Aire gForce Ultra Скачать руководство пользователя страница 115](http://html1.mh-extra.com/html/data-aire/gforce-ultra/gforce-ultra_installation-operation-and-maintenance-manual_3688320115.webp)
gForce Ultra IOM
115
MAINTENANCE/INSPECTION CHECKLIST
(NOTE:
Maintenance/inspection items are monthly unless otherwise specified.
)
Air-Cooled Condenser, Condensing Unit, or
Fluid Cooler (if applicable)
☐
Inspect coil/clean if required
☐
Inspect motor/motor mounts
☐
Inspect fan blade(s)
☐
Check wiring
☐
Inspect piping for leaks
Fluid Cooler (Dry Cooler) (if applicable)
☐
Inspect coil/clean if required
☐
Inspect motor/motor mounts
☐
Inspect fan blade(s)
☐
Check wiring
☐
Inspect piping for leaks
Glycol Pump
– Monthly (if applicable)
☐
Glycol leaks (pump area)
☐
Pump operation
☐
Auto air vent clean of mineral deposits
Glycol Pump
– Quarterly (if applicable)
Record pump pressures: #1
Suction:
PSIG
Discharge:
PSIG
Record pump current draw:
L1
A L2 A L3 A
Record pump pressures: #2
Suction:
PSIG
Discharge:
PSIG
L1
A L2 A L3 A
Equipment Runtimes
Blower:
Compressor #1:
Compressor #2:
Condenser:
Reheat #1 (if equipped):
Reheat #2 (if equipped):
Reheat #3 (if equipped):
Humidifier (if equipped):
Dehumidification:
Energy Saver (if equipped):
☐
Reset all to zero runtimes Date:
Hours
Hours
Hours
Hours
Hours
Hours
Hours
Hours
Hours
Hours
Содержание gForce Ultra
Страница 1: ......
Страница 123: ...gForceUltraIOM_11 2022 docx...