
Page 20 of 43
The cables leading to the transformer live, earth and neutral are already attached (as Fig.3).
This is the connection point for your mains supply to the transformer used to power the light
head. You will not need to perform any electrical wiring on the transformer other than
connecting the three power wires to your source.
Fig.3
4.3.5 Primary rotation arm installation
The Ceiling plate has an integrated downtube system which cannot be modified after
installation. If you require a customised length of downtube please contact DARAY.
The primary rotation arm is fitted to a 360-degree arm boss system; the arm boss is the section
that is inserted into the downtube and secured in place with locking screws. Before attaching
the arm into the downtube; you should ensure the ceiling mount is absolutely true on the
vertical plane.
This installation will require 2 or more people to fit, when inserting the arm boss into the
downtube you will need to feed the cables from the arms up through a hole located on the
downtube at the same time as the arm is attached.
Fig.4
Содержание SL730 Series
Страница 1: ...SL730 LED Minor Surgery Light Operating Installation Manual QAM SL730 0119 13...
Страница 2: ...Page 1 of 43...
Страница 44: ...Page 43 of 43 Service Notes...
Страница 45: ...Page 44 of 43...
Страница 46: ...Page 45 of 43...
Страница 47: ...Page 46 of 43...