5
6
6. Use a
pencil
to mark on the finished wall the
location of the wall anchor holes that are on the
back of the vanity (
A
).
7. Move vanity (
A
)
away from the wall and drill
1/4” holes for anchors (
C
)
using
1/4” drill bit
.
8. Remove screws (
C1
) and black washers (
C2
)
from anchors (
C
). Tap anchors (
C
) into the holes
until they are flush against the surface. Use a
hammer
if necessary.
2. Measure and mark with a
pencil
on the back
of your vanity
(
A
)
the location of the water
pipes and drain lines coming out of the wall.
3. Move vanity (
A
) away from the wall and cut
pipe holes on the back of the vanity
(
A
)
using a
hole saw
.
4. Move the vanity (
A
)
back to the intended in-
stallation location, flush against the wall.
5. Check the top of the vanity
(
A
)
for level front
to back and side to side. Adjust the height level-
ers
on the bottom of the vanity
(
A
)
to achieve
level if necessary.
L
L