5

 

 

 

 

Operation principal

 

The dehumidifier works with two air flows. The volume of the dehumidified air is bigger. The air 
flow of a smaller volume is used for moisture removal from the dehumidifier rotor. The rotor is 
subject  to  the  action  of  different  oppositely  directed  air  flows  by  sectors.  The  air  flow  to  be 
dehumidified (

PROCESS AIR

) passes through the biggest sector. The moisture from the air is 

trapped (adsorbed) by the rotor material. The air leaves the rotor in dehumidified condition (

DRY 

AIR

)  and  is  directed  to  a  certain  part  of  the  building  or  a  technological  process  where 

dehumidified air or a certain air humidity levels are required. Since the rotor rotates slowly the 
incoming  air  always  contacts  with  the  rotor  active  part,  thus  a  continuous  dehumidification 
process is assured.

 

The air flow used for the rotor matrix regeneration is called regeneration air (

REGENERATION 

AIR

). It is heated up to 120

о

С and when passing through a small sector it removes the moisture 

trapped by the rotor material. The moisture is removed from the rotor in the form of humid air 
(

MOIST AIR

) which is discharged outside the dehumidified loop.

 

 

 

Process air 

 

Adsorption rotor 

 

Dry air 

Содержание AD-400

Страница 1: ...DanVex AD 400 Adsorption air dehumidi er Operation manual...

Страница 2: ...R www danvex...

Страница 3: ...NT Safety instructions 3 Introduction 4 Purpose 4 Design 4 Operation principle 5 Dimensions and weight 5 Installation 6 Technical data 7 Commissioning 7 Maintenance 8 Transportation 8 Parts list 9 War...

Страница 4: ......

Страница 5: ...explosion hazard Before opening any panels of the unit body it is required to disconnect the dehumidi er from the mains Before starting any maintenance works the dehumidi er should be out of operatio...

Страница 6: ...all volume of the rotor This material is highly ef cient for water molecules attraction and retention it is noncombustible and explosion proof with a long service life The rotor manufacturing technolo...

Страница 7: ...ondition DRY AIR and is directed to a certain part of the building or a technological process where dehumidi ed air or a certain air humidity levels are required Since the rotor rotates slowly the inc...

Страница 8: ...e rotor The rotor is reactivated by another air ow preheated to 120 C The moisture is removed from the room in the form of moist air Pic 1 Dehumidi er air ows diagram Pic 2 AD 400 dehumidi er dimensio...

Страница 9: ...upright it should be insulated and drain holes should be drilled in the lowest part of the elbow bend 2 4 mm Regeneration airduct The regeneration air duct should be as short as possible A metal net...

Страница 10: ...ls are clean and not blocked 4 Make sure that air lters are installed and clean 5 Manually turn the fans impellers and make sure they rotate freely 6 Check the internal fuse 7 Close the service panels...

Страница 11: ...per month Never use the dehumidi er without lters Rotor The rotor is maintenance free However for cleaning purposes it can be ushed out by compressed air A rotor cleaning procedure requires special k...

Страница 12: ...w danvex 1 0 Parts list Table 3 Name Number per dehumidi er Rotor drive motor 1 Condenser 1 Belt pulley 1 Rotor drive belt 1 Belt tensioner 1 Dehumidi ed air fan 1 Regeneration air fan 1 Heater 1 Roto...

Страница 13: ...ns when it supplies the Customer a repaired or a spare part Parts repair or replacement does not resultin the warranty period extension The parts and components replaced under the warranty belong to D...

Страница 14: ......

Отзывы: