14
1.- INSTALLATION
1.1.- Installation diagram
See Figure. 1
1.2.- Positioning
The washing machine must be firmly secured on the floor, which will support
the its weight and the residual force generated while spinning.
After unpacking the washing machine, the pieces that secure the free-floating
part and the chassis during transportation should be removed. In order to do this, the
front and back panels should be removed to access the fixing elements. They are easily
seen as they are red.
It is advisable to secure the washing machine with the screws provided with it.
In order to do so, plastic plugs must be inserted into the previously drilled holes (Fig. 2).
The washing machine must be correctly levelled leaving a space at the back to
facilitate its maintenance.
1.3.- Water connection
If only cold water is available, water connection is carried out as shown in
Figure 3. If hot water is available, connection will be performed as shown in Figure 4. If
decalcified water is also available, connection will be performed as shown in Figure 5.
Necessary dynamic pressure: 2
÷
4 Kg/cm
2
.
1.4.- Steam connection
If steam is available, heating of washing water will be injected directly. The
connection diagram is shown in Figure 6.
Steam pressure: 2
÷
4 Kg/cm
2
.
After steam has been introduced into the machine for the first time, it is
advisable for the steam hose nuts to be re-tightened.
1.5.- Drainage
Fix the drainage bend pipe as shown in Figure 7.
Содержание WED 10
Страница 6: ...4 A Produit pr lavage B Lessive C Eau de Javel D Assouplissant Fig 10 Fig 11...
Страница 32: ...30 Instructions de programmation LAVE LINGE Mod WED 8 WED 10 WED13 WED18 WED2007 25 WED 55...
Страница 56: ...12 A Pre wash detergent B Washing detergent C Bleach D Softener Fig 10 Fig 11...
Страница 81: ...37 Programming instructions WASHING MACHINES Mods WED 8 WED 10 WED 13 WED 18 WED2007 25 WED55...
Страница 102: ...ELECTRICAL DIAGRAM FOR WED2007 25...
Страница 103: ......