background image

Oilburner

Type Gulliver RG3

Page 4 of 9

Assembling

Dimensioning of the oil pipes

K:\framen\instrukt\Dantherm\RG\Engelsk\RG3\RG3.fm-M2-021108-dm/lbk

Max lenght of suction line

H

Dimensioning

8/10 mm

10/12 mm

0 m

35 m

100 m

0,5 m

30 m

100 m

1,0 m

25 m

100 m

1,5 m

20 m

90 m

2,0 m

15 m

70 m

3,0 m

8 m

30 m

3,5 m

6 m

20 m

The burner is designed to allow entry of the oil supply pipes on either side. Depending on
the oil supply pipes position (to the right or to the left hand side of the burner).

One-line system:

On the tank installa-
tion, where vacuum
can occur in the oil
tubes, you install a
flow-control between
the front filter and the
oil burner.

The pump suction should
not exceed a maximum of
0.4 bar (30 cm Hg). Bey-
ond this limit gas is rea-
lised from the oil.

Oil lines must be complet-
ely air tight.

It is necessary to install a filter on
the fuel supply line.

Start the burner and wait for the priming.
Should lock-out ocur prior to the arrival of the fuel,
await at least 20 seconds before repeating the
operation.

Содержание Gulliver RG3

Страница 1: ...Oilburner RG3 GB Code No 970929...

Страница 2: ...instruction should be kept in the furnace room The user is responsible for the burners working order and that the following points are observed Regulations The furnace room and the room containing th...

Страница 3: ...W Capasitor 6 3 F Ignition transformer Secondary 8 kV 16 mA Control box 550 SMD Pump capacity Max 30 kg h at 10 bar Pump pressure 8 15 bar Approval MK 10 10 1255 1 Oil pump 2 Control box 3 Reset butto...

Страница 4: ...on chamber Po Technical instructions Capacity diagram start up cycle K framen instrukt Dantherm RG Engelsk RG3 RG3 fm T2 021108 DM lbk Burner start up cycle Thermostat Motor Ignition transformer Valve...

Страница 5: ...he by pass screw 3 and then screw again the plug 2 It is sufficient to loosen the suction gauge con nection 5 and wait until oil flows out It is neccesary to install a filter on the fuel sup ply line...

Страница 6: ...on the oil supply pipes position to the right or to the left hand side of the burner One line system On the tank installa tion where vacuum can occur in the oil tubes you install a flow control betwee...

Страница 7: ...to the arrow direction after removing all components the 7 pin plug and earth wire Ignition transformator The ignition transformator is build in in the control box The ignition cables are con nected t...

Страница 8: ...ozzle holder 2 and lock it by screw 3 For prospective adjustments of the eletro des assembly loosen screw 4 Combustion head setting It depends on the output of the burner and is carried out by rotatin...

Страница 9: ...ended Delavan Type W B Danfoss Type S B Monarch Type R Steinen Type S Q K framen instrukt Dantherm RG Engelsk RG3 RG3 fm I2 021108 dm lbk Adjustment Nozzle Pump pressure Burner output Combustion head...

Страница 10: ...Oilburner Type Gulliver RG3 Page 8 of 9 Electrical wiring K framen instrukt Dantherm RG Engelsk RG3 RG3 fm E1 021108 dm lbk...

Страница 11: ...ver 11 80007458 Viewing port 12 80007644 Bracket and screw 13 80000443 Joint 14 80007465 High voltage lead 15 80007651 Suction duct 16 80007466 Support 17 80007645 Diffuser disc 18 80007495 Electrode...