7
Installation
: Handling and set-up
Handling and set-up
Follow these instructions when handling the room unit:
Risk of plate deformation, damaging unit and human injuries
•
Do NOT lift the room unit at
the handle
•
Use handle ONLY to push
and drag the room unit
•
Use a ramp to get the ACT-7
unit over a curb or alike.
Risk of damaging the cooling circuit when laying down the room unit
Oil from the compressor can get inside
and damage the cooling circuit, if the
unit is laid down.
•
Do NOT lay the room unit down
•
Always transport the room unit in
an upright position
Avoid getting the water/glycol mixture on your skin and clothes
The water/glycol mixture contains anticorrosive substances, which is noxious and can lead to
skin irritation. The substance can be difficult to remove from clothes.
•
Use gloves for connecting and disconnecting the interconnecting line.
•
If the glycol/water mixture is spilled on your skin, wash thoroughly with
water and soap.
•
Wear work clothes while connecting and disconnecting the ACT-7.
Check always the fluid level of the ACT-7
room unit before starting up the unit.
Look through the inspection window
(use a flashlight, if necessary) and check,
if the fluid level is between MIN and MAX
level. Top up the fluid, if the level is below
MIN.
Follow the steps below, if you need to fill up the fluid level.
step Action
Illustration
1
Ensure the ACT-7 is running in cool-
ing mode, before removing the filler
cap.
2
Loosen the screws and remove the
security plate of the filler cap.
3
Slowly remove the filler cap
Handling
Warning
Caution
CAUTION
Warning
Caution
CAUTION
Warning
Caution
CAUTION
Precautions
Check the fluid
level
en
Содержание ACT-7 EU
Страница 1: ...ACT 7 USER MANUAL en Rev 1 1 2019 W14 5...
Страница 17: ......
Страница 18: ......
Страница 19: ......