11
INSTALLATION INSTRUCTIONS
TOOLS REQUIRED
•
10*Amp/120Volt ½” Corded or Cordless Drill -
DO NOT
use Impact Drill
•
(*less than 10 Amps may have difficulty in raising larger vehicle)
•
Open-end Wrench
•
Socket Wrench
•
Phillips Screwdriver
IMPORTANT NOTICE
These instructions must be followed to ensure proper installation and
operation of your lift. Failure to comply with these instructions can result
in serious bodily harm and void product warranty. Manufacturer will
assume no liability for loss or damage of any kind, expressed or implied
resulting from improper installation or use of this product
.
STEP 1
SELECTING SITE
BEFORE USING YOUR NEW LIFT, CHECK THE FOLLOWING:
1.
LIFT LOCATION:
Check layout dimension against floor plan
requirements making sure that adequate space is available.
2.
OVERHEAD OBSTRUCTIONS:
The area where the lift will be
located should be free of overhead obstructions such as heaters,
building supports, electrical lines etc.
3.
DEFECTIVE FLOOR:
Visually inspect the site where the lift is to
be used and check for cracked or defective concrete
4.
OPERATING TEMPERATURE.
Operate lift only between temperatures of
41° - 104° F (5º - 40 º C).
DO NOT use this lift on any asphalt surface or any soft or uneven
surfaces other than concrete.
Содержание MAXJAX TILT
Страница 2: ......
Страница 16: ...16 ASSEMBLY OF MAXJAX TILT continued Finished Images of MaxJax Tilt ...
Страница 25: ...25 ...
Страница 26: ...26 ...