7.4 Commissioning Test
The commissioning test for systems with safety functions is
focused on validating the functionality of safety
monitoring and stop functions configured in the frequency
converter system.
The test objective is to verify proper configuration of the
defined safety functions and of test mechanisms and to
examine the response of specific monitoring functions to
the explicit input of values outside tolerance limits. Test
safety-configured monitoring functions running in the final
set-up.
7.4.1 Safety Guidelines
When commissioning/recommissioning, note the following
•
Secure the site in accordance with the regulations
(barrier, warning signs etc.). The system may only
be commissioned/recommissioned by qualified
personnel.
•
Refer to the information and specifications stated
in the operating instructions of the relevant
programmable control system.
•
During commissioning/recommissioning, make
sure that no personal injury and/or material
damage can occur, even if the plant/machine
moves unintentionally.
•
When commissioning the safety option, read the
safety guidelines in the
Start up and Functional
Testing
chapter in the operating instructions for
the frequency converter.
7.4.2 Condition before Performing the
Commissioning Test
The system integrator/machine manufacturer performs a
commissioning test of the safety option to verify and
document the correct selection of the safety option
parameter values. The system integrator/machine