Illustration 64: I/O Mapping of an ISD 510 Servo Drive
Map the inputs and outputs of the instance of the
PSM_REF
,
DAM_REF
, and
ACM_REF
function blocks and the physical data
points of the PSM/DAM/ACM accordingly.
6.10.12 Setting the PLC Cycle Time
The minimum cycle time is 400 µs. The servo system devices can run Ethernet POWERLINK
®
cycle times in multiples of 400 µs and
multiples of 500 µs. The devices are automatically parameterized by the PLC on start-up, depending on the Ethernet POWERLINK
®
configuration of the physical interface. The Ethernet POWERLINK
®
configuration can be accessed by right-clicking [CPU
→
Open IF3
POWERLINK Configuration] in the
Physical View
for V3.0.90 or [PLK
→
Configuration] for V4.x.
N O T I C E
Ensure that the task cycle times of the PLC program and Ethernet POWERLINK
®
are the same. Otherwise, data could be lost
and performance reduced.
e
3
0
b
g
3
4
4
.1
0
Illustration 65: Ethernet POWERLINK<
®
Configuration Window to Parameterize Ethernet POWERLINK
®
Cycle Time
Procedure for setting the PLC time in Automation Studio
™
Right-click [CPU
→
Open Software Configuration] for V3.0.90 and [CPU
→
Configuration
→
Timing] for V4.x in the
Physical
View
.
Ensure that the PLC cycle time is the same as the Ethernet POWERLINK
®
cycle time.
6.10.13 Connecting to the PLC
Information on how to connect to the PLC can be found in detail in the Automation Studio
™
Help.
Version V3.0.90:
Open the
B&R Help Explorer
and go to [Automation Software
→
Getting Started
→
Creating programs with Automation Studio
→
First project with X20 CPU
→
Configure online connection].
Version V4.x:
Open the
B&R Help Explorer
and go to [Automation Software
→
Getting Started
→
Creating programs in Automation Studio
→
Ex-
ample project for a target system with CompactFlash].
AQ262449648484en-000101 / 175R1135 | 95
Danfoss A/S © 2020.08
Commissioning
VLT® Servo Drive System ISD 510/DSD 510