Place spring (13) with Vaseline in amplifier spool (12).
3. Place O-rings, 2x (57), 2x (58) and 2x (59) and spring stop (30) in end cover (66).
a) Place large spring (29) and small spring (28) in end cover (66).
Service Manual
OSQA/OSQB
Assembly
©
Danfoss | July 2016
HN25D293 | AX00000127en-US0101 | 35