manualshive.com logo in svg
background image

Data sheet

DH-SMT/SI

VD.KH.B1.02  

©  Danfoss 03/2008

3

Actuator for two point control AMI 140

a)  Check the valve’s neck. The actuator should 

be in steam up position (factory setting) 

.

  Ensure that the  actuator is mounted securely 

on the valve body.

b)  Energise the actuator according to the wiring 

diagram - see page 2. 

 
c)  The direction of stem movement can be 

observed on the position indicator 

.

Installation and 

commissioning procedure

(if required)

Manual override

(for service purposes only)

1.  Remove the cover.
2.  Insert the Allen key 6 into the spindle.
3.  Press and hold the button (on the bottom side 

of the actuator) during manual override.

4.  Pull out the tool.
5.  Place cover back on the actuator. 

Do not touch anything on 

the PCB! Before removing 

the cover in need of hand 

operation with Allen key 

power supply must be 

disconnected. 

Lethal voltage!

Caution:

Do not manually operate the 

drive under power!

Remark:

A ”click” sound after energizing the actuator 
means that the gear wheel has jumped into 
normal position.

position indicator

push 

Allen key 6mm

stem up

stem down

Отзывы: