Handling, transport and storage
Handling
All lifting and handling of the HIU must be carried out in an ergonomically
responsible manner.
Transport and storage
The unit must be properly packed during both transit and storage.
Transport temperature:
-10 to +65°C
Storage temperature:
+10 to +65°C
When storing the unit prior to installation, it must be stored in a dry,
heated place.
If more units are supplied at the same time, they must never be stacked
higher than they were at the factory.
Assembly, installation and commissioning
Unpacking and preparation
Remove the packaging from the unit.
Cling film and cardboard must be disposed of in accordance with locally
applicable legislation.
Authorised personnel
Assembly, installation and commissioning must only be carried out
by an authorised HVAC technician.
Lifting the unit
When lifting the unit out of the cardboard box, only lift by the pipes
that are attached to the back plate.
Otherwise, to the extent possible, the HIU must be lifted by the back
plate.
In connection with assembly, the unit must be lifted according to
the section “lifting instructions”.
Warning of transport damage
Before installing the unit, check to ensure the product has not been
damaged during transit.