28 | © Danfoss | DHS-SRMT/SI | 2022.11
Termix VX-IV - 3 Series DS Fully insulated
Pre hand over check list
9
38
9
7
14
20
26
31
69
M
A
48
10
41B
4
48
Description:
Pos.
Page
OK
Remark:
Connection connected correctly
10
All connections tightened
Primary system flushed, through flushing bypass
2 Strainers checked
9
18
Differential pressure controller adjusted
31
20
Clip on actuator removed
69
20
Wiring completed
14-15
Mains connected
Room controller connected and working
Pre payment unit connected and working
Pump setting completed
10
20-21
Correct pressure on secondary system
26
17
System properly vented
48
18
UFH stat mounted correctly on heating supply line
60
22
Safety valve checked and piped to drain
4
22
Heating temperature setting
7
19
Flushing bypass closed
Insulation has been remounted
Date:
Unit No.:
Carried out by: