Installation & Maintenance

 •  Switch off the system and isolate the main power 

supply.

 •  Ensure that power supply cannot be switched on 

during installation.

 •  All electrical components must be selected as 

per local standards and unit requirements.

 •  Refer to wiring diagram for electrical connections 

details.

 •  Ensure that the power supply corresponds to the 

unit characteristics and that the power supply 
is stable (nominal voltage ±10 % and nominal 
frequency ±2.5 Hz).

 •  Dimension the power supply cables according to 

unit data for voltage and current.

 •  Protect the power supply and ensure correct 

earthing.

 •  Make the power supply according to local 

standards and legal requirements.

 •  The unit includes high and low-pressure switches 

which, when activated, cut the power supply 
to the compressor. Parameters for high and 
low-pressure cut-outs are to be adjusted by 
the installer, depending on the compressor 
model, refrigerant and application. For units 
with a 3-phase scroll compressor, correct phase 
sequence for compressor rotation direction shall 
be observed.

 •  Determine the phase sequence by using a phase 

meter to establish the phase order of line phases 
L1, L2 and L3.

 •  Connect line phases L1, L2 and L3 to main switch 

terminals T1, T2 and T3, respectively.

 •  Wear protective stuff like goggles and protective 

gloves.

 •  Never start the compressor under vacuum. Keep 

the compressor switched off. 

 •  Before charging the refrigerant, verify that the oil 

level is between “¼” and “¾” on the compressor 
oil sight glass. If additional oil is required, please 
refer to the compressor’s label for type of oil.

 •  Use only the refrigerant for which the unit is 

designed for.

 •  Fill the refrigerant in liquid phase into the 

condenser or liquid receiver. Ensure a slow 

charging of the system to 4-5 bar for R404A/
R507A or R22, and approx. 2 bar for R134a.

 •  Do not put liquid refrigerant through the suction 

line.

 •  It is not allow to mix additives with the oil and/or 

refrigerant

 •  The remaining charge is done until the 

installation has reached a level of stable nominal 
condition during operation.

 •  Never leave the filling cylinder connected to the 

circuit.

 Use safety devices (such as safety pressure 

switches and mechanical relief valves) in 
compliance with both generally and locally 
applicable regulations and safety standards. Make 
sure that the devices are operational and properly 
set.

 Check that the settings of high-pressure 

switches and relief valves don’t exceed the 
maximum service pressure of any system 
component.

 •  Verify that all electrical connections are 

properly fastened and in compliance with local 
regulations.

 •  When a crankcase heater is required, it must be 

energized at least 12 hours before initial start-up 
and start-up after prolonged shut-down or belt 
type crankcase heaters.

 •  Never start the unit when no refrigerant is 

charged.

 •  All service valves must be in the open position. 
 •  Check compliance between unit and power 

supply.

 •  Check that the crankcase heater is working.
 •  Check that the fan can rotate freely.
 •  Check that the protection sheet has been 

removed from the backside of condenser.

 • Balance the HP/LP pressure.
 •  Energize the unit. It must start promptly. If 

the compressor does not start, check wiring 
conformity, voltage on terminals and sequence 
phase.

 •  Eventual reverse rotation of a 3-phase 

compressor can be detected by the following 
phenomena: unit doesn’t start, the compressor 
doesn’t build up pressure, it has abnormally 
high sound level and abnormally low power 
consumption. In such case, shut down the unit 
immediately and connect the phases to their 
proper terminals.

 •  If the rotation direction is correct, the low-

pressure gauge shall show a declining pressure 
and the high-pressure gauge shall show an 
increasing pressure.

Electrical connections

Filling the system

Verification before 

commissioning

Start-up

5

FRCC.ES.013.A1.02

Manual

Содержание 0012345AU0116

Страница 1: ...Installation and maintenance condensing unit manual OP HJZ HJM HGM HNU HRU HGZ LJZ LGZ Manual http cc danfoss com...

Страница 2: ...Contents English version 4 Spanish version 14 2 FRCC ES 013 A1 ML Manual...

Страница 3: ...by qualified personnel only Follow these instructions and best practices on refrigeration engineering during installation commissioning maintenance and servicing tasks 2 The condensing unit must only...

Страница 4: ...d dehydrated refrigeration grade copper tubes and silver alloy brazing material Use clean and dehydrated system components The suction piping connected to the compressor must be flexible in 3 dimensio...

Страница 5: ...put liquid refrigerant through the suction line It is not allow to mix additives with the oil and or refrigerant The remaining charge is done until the installation has reached a level of stable nomi...

Страница 6: ...s are still adequately fastened Keep the unit clean and verify the absence of rust and oxidation on the unit components tubes and electrical connections The condenser must be checked at least once a y...

Страница 7: ...t View Top View Suction Line Liquid line X X X X X Y Suction Line Liquid Line Iso View H L D Fixation X mm Y mm Height H mm Depth D mm Length L mm OP HJ 018D 022D 16 126 463 310 1000 OP HJ 028D 036D 1...

Страница 8: ...Height H mm Depth D mm Length L mm OP HG 064D 100D 25 20 500 715 800 1200 OP HG 125D 160D 971 Drawing 2B version D40 reciprocating compressor 2 fans Fixation X1 mm X2 mm Y mm Height H mm Depth D mm L...

Страница 9: ...mm OP HNU 015D 021D 14 174 538 420 1150 OP HNU 030D 688 Air flow Drawing 3A version D40 Scroll Compressor 1 fan Weiguang Front View Left View Top View Suction Line Liquid line X X X X X Y Suction Line...

Страница 10: ...l compressor 2 fans Fixation X1 mm X2 mm Y mm Height H mm Depth D mm Length L mm OP HRU 038D 048D 25 20 500 715 800 1200 OP HRU 058D 076D 971 Fixation X1 mm X2 mm Y mm Height H mm Depth D mm Length L...

Страница 11: ...C Fan capacitor MP Motor protector K Contactor HP High pressure switch LP Low pressure switch CH Crankcase heater RL Relay F Fan Electrical code Q 230 V 3 ph 60 Hz units with reciprocating compressors...

Страница 12: ...Fan capacitor MP Motor protector K Contactor HP High pressure switch LP Low pressure switch CH Crankcase heater F1 F2 Fan Electrical code Q 230 V 3 ph 60 Hz units with scroll compressors POWER WHITE W...

Страница 13: ...WHITE WHITE RED RED RED RED RED RED RED BLACK BLACK BLACK BLACK BLACK BLACK BLACK BLACK BLACK WHITE RED BLACK POWER PACK PRESSURE SWITCH FROM HIGH PRESSURE SWITCH FROM LOW PE GREEN BLACK BLACK SEQUEN...

Страница 14: ...los requisitos establecidos por la norma EN 378 o cualquier otro reglamento local vigente en materia de seguridad 4 Esta unidad condensadora se suministra con gas nitr geno a presi n 1 bar y por lo t...

Страница 15: ...caracter sticas La instalaci n de unidades destinadas al uso con refrigerantes HFC requiere del empleo de equipos dise ados espec ficamente para tales refrigerantes y que no hayan permanecido en conta...

Страница 16: ...dir aceite consulte la etiqueta del compresor para conocer el tipo de aceite que debe emplearse Utilice exclusivamente el refrigerante para el que se haya dise ado la unidad Llene el condensador o el...

Страница 17: ...inuci n de la presi n y el man metro de alta presi n deber indicar un aumento de presi n Arranque Compruebe el sentido de giro del ventilador Debe circular aire desde el condensador hacia el ventilado...

Страница 18: ...ntines de tubo y aletas Desconecte la unidad condensadora utilizando el interruptor principal antes de desmontar cualquier panel de la misma Elimine la suciedad las hojas las fibras etc de las superfi...

Страница 19: ...sta frontal Vista lateral izquierda Vista superior X X X X X Y Vista isom trica H L D L nea de aspiraci n L nea de aspiraci n L nea de l quido L nea de l quido Fijaciones X mm Y mm Altura H mm Profund...

Страница 20: ...dad D mm Longitud L mm OP HG 064D 100D 25 20 500 715 800 1200 OP HG 125D 160D 971 Dibujo 2B versi n D40 reciprocante herm tico 2 ventiladores Flujo de aire D L H Y Y Drawing 2B version D40 reciprocati...

Страница 21: ...nea de aspiraci n Flujo de aire Drawing 3B version D32 Scroll Compressor 1 fan Weiguang Vista frontal Vista lateral izquierda Vista superior X X X X X Y Vista isom trica D L H L nea de aspiraci n L ne...

Страница 22: ...adores Fijaciones X1 mm X2 mm Y mm Altura H mm Profundidad D mm Longitud L mm OP HRU 038D 048D 25 20 500 715 800 1200 OP HRU 058D 076D 971 Flujo de aire Drawing 4A version D40 Scroll Compressor 2 fan...

Страница 23: ...el ventilador GM Guardamotor K Contactor PH Presostato de alta PL Presostato de baja RC Resistencia de c rter RL Relay V Ventilador C digo El ctrico Q 230V 3F 60Hz Unidades con compresor reciprocante...

Страница 24: ...resor reciprocante herm tico Leyenda CP Compressor CV Capacitor del ventilador GM Guardamotor K Contator PH Presostato de alta PL Presostato de baja RC Resistencia de c rter V1 V2 Ventilador C digo El...

Страница 25: ...Instalaci n y el mantenimiento C digo El ctrico R 460V 3F 60Hz Unidades con compresor scroll 25 FRCC ES 013 A1 05 Manual...

Страница 26: ...ned us as distinct variable speed technology specialists Today we operate from engineering and manufacturing facilities spanning across three continents FRCC ES 013 A1 ML Danfoss DCS CC 2016 12 Our pr...

Отзывы: