1
PART NO
QTY
2
M4.2X16
Z01
L14
L01B
2
L14
L01B
L01A
28
1
2
L14
1. Adjust the door until it moves smoothly
2. Fix L14 to the end roof glazing bar (L01B) with the self-tapping screws (Z01) using a powered
screwdriver. The inside of the glazing bars feature guide lines which indicate the correct
screw positions (see detail drawings below). Be careful to ensure that the screws are in the
correct position (see detail drawings below).
Screw Position
Содержание GH152020
Страница 1: ...for Greenhouse 2 45x3 04x2 1m Manual 28 11 2019...
Страница 2: ...Assembly Instructions PRODUCT SIZE LxWxH 304X245X210CM PLEASE READ CAREFULLY BEFORE ASSEMBLY...
Страница 3: ...CONTENTS...
Страница 28: ...PART NO QTY 9 1 Y7 Y9 10 Y6 24 Y7 Y9 Y7 Y6 Y6 Y6 Y6 Y7 Y7 Y7 Y7 Y7 Y6 Y6 Y6 Y6 Y6 Y6 Y7 Y7 Panel Assembly...
Страница 31: ...L14 L14 27 L14 left door right door left door right door...