L01A
L10
L04A
L04B
L01A
1
2
2
1
L01A
L10
L04A
L04B
3
4
L01A
PART NO
QTY
2
L01A
1
L10
4
M4.2X16
Z01
1
L04A
1
L04B
6
1
L10
L01A
L10
L01A
2
3
L04A
4
L04B
L01A
1. Lay out the glazing bars (2 x L01A, L04A and L04B) and the
cill (L10). Ensure that the cill upstand is on the inside
and that L01A is the correct way round.
2. Make a pencil mark on the glazing bars (2 x L01A, L04A and
L04B) at a height of 1059mm from the bottom. This will help
later when fitting part L05B.
3. Fix the glazing bars (2 x L01A, L04A and L04B) to the cill
(L10) with the self-tapping screws (Z01) using a powered
screwdriver. The inside of the glazing bars feature guide
lines which indicate the correct screw positions (see detail
drawings below). Be careful to ensure that the screws are
in the correct position (see detail drawings below).
Screw
position
Screw
position
Screw
position
Screw
position
Screw
position
Screw
position
1059MM
Содержание GH152020
Страница 1: ...for Greenhouse 2 45x3 04x2 1m Manual 28 11 2019...
Страница 2: ...Assembly Instructions PRODUCT SIZE LxWxH 304X245X210CM PLEASE READ CAREFULLY BEFORE ASSEMBLY...
Страница 3: ...CONTENTS...
Страница 28: ...PART NO QTY 9 1 Y7 Y9 10 Y6 24 Y7 Y9 Y7 Y6 Y6 Y6 Y6 Y7 Y7 Y7 Y7 Y7 Y6 Y6 Y6 Y6 Y6 Y6 Y7 Y7 Panel Assembly...
Страница 31: ...L14 L14 27 L14 left door right door left door right door...