![Dancover GH152020 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/dancover/gh152020/gh152020_manual_506099011.webp)
2
1
L05B
L05B
Z01
Z01
L11
L11
3*S01
L11
3*S01
L05B
L05B
3
4
5
6
L11
L11
1
2
2
1
5
6
L01A
7
L04A
L04B
L01A
L04A/B
L05B
L01A
2
L05B
8
M4.2X16
Z01
1
L11
PART NO
QTY
M6X10
S01
6
M6
M01
2
1. Fix 1 x L05B to L01A and L04A and 1 x L05B to L04B and L01A with the self-tapping screws (Z01)
using a powered screwdriver. Ensure that L05B is fixed at a right angle (90 degrees) to the
glazing bars (2 x L01A, L04A and L04B).
2. Slide 3 bolts (S01) into the inside L11 bolt channel and fix L11 to L04A and L04B (see Figure 4,
Figure 5 and Figure 6). Slide 3 bolts (S01) into the external L11 bolt channel (see Figure 3).
This will help later when fitting part L14.
3. Part W02 is factory fitted to glazing bars L04A and L04B.
Screw
position
1059MM
Содержание GH152020
Страница 1: ...for Greenhouse 2 45x3 04x2 1m Manual 28 11 2019...
Страница 2: ...Assembly Instructions PRODUCT SIZE LxWxH 304X245X210CM PLEASE READ CAREFULLY BEFORE ASSEMBLY...
Страница 3: ...CONTENTS...
Страница 28: ...PART NO QTY 9 1 Y7 Y9 10 Y6 24 Y7 Y9 Y7 Y6 Y6 Y6 Y6 Y7 Y7 Y7 Y7 Y7 Y6 Y6 Y6 Y6 Y6 Y6 Y7 Y7 Panel Assembly...
Страница 31: ...L14 L14 27 L14 left door right door left door right door...