37
PART
NO
QTY
L02B
2
1
K
L02B
L24C
K
1
2
L02B
W11&S01
M03
L24C
L07
L02B
4
K
4
W11
4
S01
M6X12
4
M03
M6
4
Put connector K into the slot of L07
turn its direction until it goes into
the hole on L02B. Tight the bolt in
the connector K with the spanner. Pay
attention to the direction on the spanner.
Do the same on the other sides.
Slide in
Tight it up
Содержание GH152015
Страница 1: ...28 11 2019 for Orangery 3 2x2 83x2 75m Manual...
Страница 2: ...PRODUCT SIZE LxWxH 320x283x275cm PLEASE READ CAREFULLY BEFORE ASSEMBLY Assembly Instructions...
Страница 3: ...CONTENTS 1...
Страница 13: ...12 Z03 Z03 W06 Y10 Y10 Fix the W06 vent handles using Z03 screws...
Страница 14: ...13 Y10 Fill the gap with silicone sealant on 4 sides to avoid any leaking...
Страница 30: ...28 L23C L02K PART NO QTY L23C 11 L23C Tap the bar capping L23C into L02K gently with a rubber mallet...
Страница 32: ...30 PART NO QTY 4 L03A W11 4 S01 M6X12 4 M03 M6 4 M03 L03A Do the same for the left L03A...
Страница 43: ...41 Fill the silicone sealant on the places shown above to avoid any water leaking Do the same on the other side...