21
B
J02
L07
L07
L01A
B
J02
L07
L07
L01A
1
2
S02X3pcs
PART
NO
QTY
L07
6
B
6
J02
6
3
S01
M6X12
1
L07
1
L07
L07
L07
L07
L07
1
1
1
1
Make sure
you pay
close attention
to the direction
of the pins
Assembly L07 and L01A with connector B, insert connector B
into L01A and L07, tight the bolt with the special spanner
when the it's in the right position.
L10
Slide S01 (3PCS) into the
channel of L07 for later use,
the one which is Parallel to L10.
Don't forget the anchor bracket J02.
Содержание GH152015
Страница 1: ...28 11 2019 for Orangery 3 2x2 83x2 75m Manual...
Страница 2: ...PRODUCT SIZE LxWxH 320x283x275cm PLEASE READ CAREFULLY BEFORE ASSEMBLY Assembly Instructions...
Страница 3: ...CONTENTS 1...
Страница 13: ...12 Z03 Z03 W06 Y10 Y10 Fix the W06 vent handles using Z03 screws...
Страница 14: ...13 Y10 Fill the gap with silicone sealant on 4 sides to avoid any leaking...
Страница 30: ...28 L23C L02K PART NO QTY L23C 11 L23C Tap the bar capping L23C into L02K gently with a rubber mallet...
Страница 32: ...30 PART NO QTY 4 L03A W11 4 S01 M6X12 4 M03 M6 4 M03 L03A Do the same for the left L03A...
Страница 43: ...41 Fill the silicone sealant on the places shown above to avoid any water leaking Do the same on the other side...