11
When installing the greenhouse
through digging (without
foundation), connect elements
1 and 3 to the frame. Fasten
bottom wire bandage in free hole
of element 3. Install end elements
6, 6к, 7, 8, 21.
Pic.10
2
6к
4н
2
1
arm
6к
Pic
. 7
Connect arcs 4н to arcs
4в from one side of
greenhouse.
Connect balks 2 to arcs
4н
Pic
.9
Connect arcs 4н and
balks 2 from the other
side of reenhouse in the
same way.
Assembling stages
Manual
4н
4н
4в
4в
4в
4в
4в
4н
4н
4н
4н
4н
4н
4н
4н
4н
4н 4н
4н 4н
4н
4в
(inside view)
(outside view)
arm
Pic
. 8
4н
2
2
4н
2
2
2
6к
8
21
21
8
7
7
6
6к
3
1
2
2
2
2
2
2
А
Б-1, Б-2
А
А
3
1
3
1
screw
М4х8
bottom wire
bandage
bottom wire
bandage
Б-1
Б-2
adhesive tape
Содержание ARROW 3m Series
Страница 1: ...20 03 2018 for Greenhouse ARROW 3 0 Manual...
Страница 2: ...any length multipple to 2m width 3 0 m height 2 4 m...
Страница 24: ...Manual 23 Cutting and fastening of coverage 3 M4x25 3 do not fully tighten 12...
Страница 25: ...Manual 24 13 1 Adhesive tape Cutting and fastening of coverage...
Страница 26: ...Manual 25 14 4 4 M4x35 4 1 3 M4x25 3 L 1 0m Cutting and fastening of coverage...