5
(4) BEARINGS
(2) U-JOINTS
(1) BEARING
(4) U-JOINTS
(2) TELESCOPING TUBES
CONVEYOR DRIVE
ALL MODELS
(6) BEARINGS
(2) SHAFT HOUSINGS
(2) U-JOINTS
TELESCOPING TUBE
(2) SQUIRTS OF SAE 90 OIL INTO JACK
CRANK
OIL CAP
CHAINS
OIL
LUBRICATE PIN JOINTS WITH SAE 80-90
PTO SHAFT
GREASE
(2) U-JOINTS AND SLIP TUBE
SPINNER GEARBOX
GREASE
UNIVERSAL GREASE ON EACH FITTING
UNDER SPINNER HUB
DRIVE SHAFT SPLINES
SPINNER GEAR BOX
WHEEL BEARINGS
GEAR BOXES
REPLACE WORN OR FAILED PARTS
TIGHTEN LOOSE BOLTS
TOUCH-UP PAINT
DAILY LUBRICATION SCHEDULE
WEEKLY LUBRICATION SCHEDULE
MONTHLY LUBRICATION SCHEDULE
ANNUAL LUBRICATION SCHEDULE
DRIVELINE
GROUND DRIVE
ALL MODELS
GROUND DRIVE
ADJUST TENSION OF CONVEYOUR AND DRIVE
CHAINS (SEE MACHINE CHECKOUT)
CHECK GROUND DRIVE TIRE INFLATION (22
PSI)
CORRECT BELT TENSION
WEEKLY
SEMI-ANNUALLY
WASH SPREADER
DRAIN, FLUSH, AND REFILL WITH SAE 90 OIL
Pay particular attention to the daily cleaning and greasing of the telescoping tube assembly.
ALL MODELS
COAT WITH GREASE OR ANTI-SEIZE COMPOUND
CHECK TO SEE THAT OIL LEVEL IS UP TO OIL LEVEL PLUG.
USE SAE 90 OIL
REPACK
LUBRICATION SCHEDULE
MAINTENANCE SCHEDULE
Содержание MOBILITY 800
Страница 17: ...15 60 SPREAD ...
Страница 18: ...16 90 SPREAD ...
Страница 19: ...17 60 to 90 SPREAD VARIABLE RATE ...
Страница 45: ...43 NOTES ...
Страница 46: ...www daltonag com 602 E VAN BUREN LENOX IOWA 50851 800 342 7498 ...