COMMISSIONING – IPS 10 000 | REV. 2.0.0 | © 2021 Dallmeier
8 Rack Installation
The installation and commissioning of the device may only be carried out by
trained specialist personnel.
You will need the following tools/accessories for installation:
•
Phillips screwdriver (5 mm)
•
Torx/six-head screwdriver (T10)
Dimensions
442 mm
533 mm
133 mm
483 mm
Fig. 1-1
35 mm
40 mm
22 mm
645 mm
445 mm
43 mm
32 mm
50 mm
Fig. 1-2