Installation Preparation
5
2 Installation Preparation
Installation Planning
Prior to the display arriving on site, review installation plans with the electrician, Internet
Service Provider, and members of the installation crew.
Support Ledger
Ensure that the ledger brackets are mounted to the upright I-beam. All ledger brackets
must be installed prior to lifting the display to the head. For ledger bracket details, refer
to DWG-988359 (use with offset mounts) and DWG-3041598 (use without offset mounts) in
Section A: Reference Drawings (p�23)
.
Display Inspection
When the display arrives on site, verify the packaging is in good condition. When
unpacking the display, inspect it for damage and potential issues.
Photograph any damage and contact your Project Manager immediately to report
issues. Failure to report and document shipping damage may void any manufacturer’s
warranties.
Содержание 65 Series
Страница 4: ...This page intentionally left blank...
Страница 28: ...This page intentionally left blank...