SET UP 

 

UNCRATING AND INSTALLATION 

 

1.  Location of the drill press should be in a well-lit area with correct power supply and that 

will not interfere with other machines or operations. 

2.  Carefully uncrate machine and inspect all packing to make sure no parts are manuals 

are thrown out. 

3.  When transporting the machine please use caution. If using a sling have someone 

steady the machine while moving. 

4.  Install your drill press on a sturdy level workbench. It must be anchored to workbench; 

the machine is top heavy.

 

5.  Connect appropriate power to the machine. Make sure circuit breakers are suitable for 

the machine. Consult local codes for proper installation of machine. Always route power 
cables in a safe manner away from traffic areas, damp areas, heat, and moving parts.  

6.  After installing the drill press, use degreasing product to clean off the anti-rust oil which 

was applied at the factory. Then wipe machined surfaces with a light coating of lubricant 
oil (way oil). 

7.  Check for damaged parts before further use of the machine. A guard or other part that is 

damaged should be replaced or repaired before use. Carefully check to determine that it 
will operate properly and perform its intended function. Check for alignment of moving 
parts and binding od moving parts. Breakage of parts or mountings and or any other 
conditions that could be affect its operation.  
 

GROUNDING INSTRUCTIONS 

 
In the event of a malfunction or breakdown, grounding provides a path of least resistance for 
electric current to reduce the risk or electrical shock. This machine is equipped with an electric 
cord must be used with a matching outlet that is properly installed and grounded in accordance 
with all local codes and ordinances.  

  Do not modify the plug provided. If it will not fit the outlet have the proper outlet installed 

by a qualified electrician.  

  Improper connection of the equipment grounding can result in a risk of electrical shock. 

The conductor with insulation having an outer surface that is green with yellow stripes is 
equipment grounding conductor. If repair or replacement of the electric cord or plug is 
necessary, do not connect the equipment grounding conductor to a live terminal. 

  Check with a qualified electrician or serviceman if the grounding instructions are not 

completely understood, or if in doubt as whether the machine is properly grounded. 

  It is not recommended to use an extension cord on the machine. If one must be used, 

use only a grounded cord on the machine and length of run needed.  

  Repaired or replace damaged or worn cords immediately. 

Содержание TB-16V

Страница 1: ...3 Fax 800 846 3253 www dakecorp com customerservice dakecorp com DAKE DRILL PRESS TB 16V INSTRUCTIONAL MANUAL WARNING Read and understand all instructions and responsibilities before operating Failure...

Страница 2: ...RES 8 SET UP 9 UNCRATING AND INSTALLATION 9 GROUNDING INSTRUCTIONS 9 BELT INSTALLATION 10 OPERATION 10 DRILL CHUCK INSTALLATION 10 INSTALLATION OF DRILL BIT 11 TOOLING REMOVAL 11 TABLE HEIGHT ADJUSTME...

Страница 3: ...the repair work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth the...

Страница 4: ...allation or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid fr...

Страница 5: ...by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item receiv...

Страница 6: ...wer 1 2 HP Table 11 3 4 x 11 3 4 Drill Type Bench Base 17 3 4 x 12 1 4 Max Drill Capacity 5 8 Spindle to Table 16 1 2 Spindle Taper MT2 Spindle to Base 26 1 2 Spindle Travel 3 1 8 Overall Height 42 1...

Страница 7: ...vity Additional Safety Warnings Keep guards in place and in working order Remove adjusting key and wrenches be in the habit of checking to see that keys and adjusting wrenched are removed from tool be...

Страница 8: ...rform any operation by moving the head or table with respect to one another Do not switch machine on or start any operation before checking that the head and table lock handles are clamped tight to co...

Страница 9: ...not operate until the part is properly repaired or replaced Lockout the motor switch when leaving the drill press Don t perform layout assembly or setup work on the table while the cutting tools rotat...

Страница 10: ...etermine that it will operate properly and perform its intended function Check for alignment of moving parts and binding od moving parts Breakage of parts or mountings and or any other conditions that...

Страница 11: ...rate machine OPERATION DRILL CHUCK INSTALLATION 1 Before inserting drill bits chucks or arbors always clean out the spindle hole and taper hole with a clean cloth 2 Open chuck jaws completely by turni...

Страница 12: ...own shafts Never exceed the maximum shaft diameter bit size for the machine TOOLING REMOVAL 1 Before removing the chuck or bit form the machine be sure the spindle has come to complete stop and power...

Страница 13: ...table is in the correct position tighten clamp release bolt securely Note Never swing the table if any material or fixturing is on it Only adjust when table is free of loose articles FEED DEPTH ADJUST...

Страница 14: ...The power of spindle revolution comes from spindle pulley and motor pulley driving The design of the spindle and motor pulley are stepless variable speed drive therefore for speed change only turn the...

Страница 15: ...any dust that may accumulate inside the motor frequency depends on environment the machine is in A coat of automotive wax needs to be applied to the table and column to help keep the surface clean If...

Страница 16: ...wn feed is too slow Feed bit fast enough allow drill press to cut Not lubricated Lubricate bit Bit is running backwards Check motor rotation Excessive drill runout or wobble Bent bit Replace bit Worn...

Страница 17: ...k tightened Loosen clamp Bent rack Straighten rack Spindle does not move up or down Belt is broken or slipping Check belt for damage and replace if needed Debris in quill Clean quill and teeth Feed de...

Страница 18: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 977102 1 17 REV112019 ELECTRICAL DIAGRAMS...

Страница 19: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 977102 1 18 REV112019 EXPLODED VIEW...

Страница 20: ...elt 11 Clamp Bolt 32 Rod Support 12 Clamp Bolt 33 Spindle Pulley 13 Collar 34 Switch 14 Screw 35 Insert Pulley 15 Clamp Bolt 36 Bearing 16 Handle 37 Quill 17 Feed Head 38 Bearing 18 Scale Sleeve 39 Sp...

Отзывы: