3.7.2 Branch selector box expansion valve
Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a mechanical check of the expansion valve
Prerequisite:
Power OFF the unit for 3 minutes. Then turn ON the unit and listen to
the expansion valve assembly. If the expansion valve does NOT make a latching
sound, continue with the electrical check of the expansion valve, see
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
315].
1
Remove the expansion valve motor from the expansion valve body, see
257].
2
Slide the expansion valve magnet over the expansion valve body and gently
rotate the magnet clockwise/counterclockwise to manually close/open the
expansion valve.
Does the expansion valve open?
Action
Yes
Perform an electrical check of the
expansion valve, see
No
Replace the Branch selector box, see
Installation manual of the Branch
selector box.
To perform an electrical check of the expansion valve
Prerequisite:
First perform a mechanical check of the expansion valve, see
252].
1
Make sure that the valve coil is firmly slid onto the valve body.
2
Disconnect the electrical connector of the expansion valve coil from the
appropriate PCB and measure the resistance of all windings (between the pins
of each phase (wire) and the common wire) using a multi meter. All
measurements MUST be approximately the same.
BS1Q-A
Expansion
valve name
Symbol
Connector
Winding
resistance
BS1Q-A
Subcool
Y1E
X4A
46 ±3 Ω
✔
HP/LP gas pipe Y2E
X7A
150 ±15 Ω
Suction gas
pipe
Y3E
X8A
150 ±15 Ω