6 Configuration
Installation and operation manual
20
RXYLQ10~14T7Y1B*
VRV IV system air conditioner
4P543426-1 – 2018.07
a
b
c
d
e
a
Liquid pipe
b
Gas pipe
c
Insulator
d
Transmission wiring (F1/F2)
e
Finishing tape
5.7.6
To route and fix the power supply
NOTICE
When routing earth wires, secure clearance of 25 mm or
more away from compressor lead wires. Failure to observe
this instruction properly may adversely affect correct
operation of other units connected to the same earth.
The power supply wiring can be routed from the front and left side.
Fix it to the lower mounting hole.
d
c
X1M
a
b
A
A
d
a
Power supply (possibility 1)
(a)
b
Power supply (possibility 2)
(a)
c
Power supply (possibility 3)
(a)
. Use conduit.
d
Tie wrap
(a)
Knockout hole has to be removed. Close the hole to avoid
small animals or dirt from entering.
5.7.7
To connect the power supply
The power supply MUST be clamped to the plastic bracket using
field supplied clamp material to prevent external force being applied
to the terminal. The green and yellow striped wire MUST be used for
earthing only.
a
b
c
d
f
g
e
j
k
h
i
a
Power supply (380~415 V, 3N~ 50 Hz)
b
Fuse
c
Earth leakage protector
d
Earth wire
e
Power supply terminal block
f
Connect each power wire: RED to L1, WHT to L2, BLK to
L3 and BLU to N
g
Earth wire (GRN/YLW)
h
Clamp the power supply to the plastic bracket using a field
supplied clamp to prevent external force being applied to
the terminal.
i
Clamp (field supplied)
j
Cup washer
k
When connecting the earth wire, it is recommended to
perform curling.
Multiple outdoor units
To connect the power supply for multiple outdoor units to each other,
ring tongues have to be used. No bare cable can be used.
In that case, the ring washer that is installed by default should be
removed.
Attach both cables to the power supply terminal as indicated below:
L1 L2 L2 N
6
Configuration
INFORMATION
It is important that all information in this chapter is read
sequentially by the installer and that the system is
configured as applicable.
DANGER: RISK OF ELECTROCUTION
6.1
Making field settings
6.1.1
About making field settings
To continue the configuration of the VRV IV heat pump system, it is
required to give some input to the PCB of the unit. This chapter will
describe how manual input is possible by operating the push
buttons/DIP switches on the PCB and reading the feedback from the
7‑segment displays.
Making settings is done via the master outdoor unit.
Next to making field settings it is also possible to confirm the current
operation parameters of the unit.
Push buttons and DIP switches
Item
Description
Push buttons
By operating the push buttons it is possible to:
▪ Perform
special
actions
(automatic
refrigerant charge, testrun, etc).
▪ Perform field settings (demand operation,
low noise, etc).
DIP switches
By operating the DIP switches it is possible to:
▪ DS1 (1): COOL/HEAT selector (refer to the
manual of the cool/heat selector switch).
OFF=not installed=factory setting
▪ DS1 (2~4): NOT USED. DO NOT CHANGE
THE FACTORY SETTING.
▪ DS2 (1~4): NOT USED. DO NOT CHANGE
THE FACTORY SETTING.
See also:
▪
"6.1.2 Field setting components" on page 21
▪
Содержание VRV IV RXMLQ8T7Y1B Series
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ...4P543426 1 2018 07 Copyright 2018 Daikin 4P543426 1 0000000M...