
Test Operation
Si37-701
166
Test Operation
1.2.7 Test Run
1.2.7.1
Before Test Run
• Make sure the following works are completed in accordance with the installation manual.
Piping work
Wiring work
Air tight test
Vacuum drying
Additional refrigerant charge
Check operation
• Check that all work for the BS unit and indoor unit are finished and there are no danger to
operate.
1.2.7.2
Test Run
After check operation is completed, operate the unit normally and check the following.
(1) Make sure the indoor and outdoor units are operating normally.
(2) Operate each indoor unit one by one and make sure the corresponding outdoor unit is also
operating.
(3)
Check to see if cold (or hot) air is coming out from the indoor unit.
(4)
Push the fan direction and strength buttons on the remote controller to see if they operate
properly.
NOTE:
• Heating is not possible if the outdoor temperature is 24°C or higher. Refer to the Operation
manual.
• If a knocking sound can be heard in the liquid compression of the compressor, stop the unit
immediately and then energize the crank case heater for a sufficient length of time before
restarting the operation.
• Once stopping, the compressor will not restart in about 5 minutes even if the On/Off button of
the remote controller is pushed.
• When the system operation is stopped by the remote controller, the outdoor units may
continue operating for further 5 minutes at maximum.
• The outdoor unit fan may rotate at low speeds if the Night-time low noise setting or the
External low noise level setting is made, but this is not a malfunction.
• If the check operation was not performed at first installation, the malfunction code “U3” will be
displayed in the remote controller. Perform the check operation following “
1.2.7.3
Checks after Test Run
Perform the following checks after the test run is complete.
• Record the contents of field setting.
→
Record them on the accessory “REQUEST FOR THE INDICATION” label.
And attach the label on the back side of the front panel.
• Record the installation date.
→
Record the installation date on the accessory “REQUEST FOR THE INDICATION” label in
accordance with the IEC60335-2-40.
And attach the label on the back side of the front panel.
NOTE:
After the test run, when handing the unit over to the customer, make sure the EL.COMPO.BOX
lid, the inspection door, and the unit casing are all attached.
Содержание VRV III REYQ8PY1
Страница 1: ...REYQ8 48PY1 R 410A Heat Recovery 50Hz Si37 701...
Страница 59: ...Specifications Si37 701 48 Specifications...
Страница 105: ...Refrigerant Flow for Each Operation Mode Si37 701 94 Refrigerant Circuit...
Страница 230: ...Si37 701 Troubleshooting by Remote Controller Troubleshooting 219...
Страница 373: ...Piping Diagrams Si37 701 362 Appendix 1 Piping Diagrams 1 1 Outdoor Unit REYQ8P 10P 12PY1 3D058154A S1NPH S2NPL...
Страница 374: ...Si37 701 Piping Diagrams Appendix 363 REYQ14P 16PY1 3D058153A S2NPL S1NPH...
Страница 375: ...Piping Diagrams Si37 701 364 Appendix REMQ8PY1 3D057743...
Страница 376: ...Si37 701 Piping Diagrams Appendix 365 REMQ10PY1 12PY1 3D057742...
Страница 377: ...Piping Diagrams Si37 701 366 Appendix REMQ14PY1 16PY1 3D057741...
Страница 382: ...Si37 701 Piping Diagrams Appendix 371 1 3 BS Unit 4D057985A...
Страница 384: ...Si37 701 Wiring Diagrams for Reference Appendix 373 REYQ14 16PY1 3D056774C...
Страница 385: ...Wiring Diagrams for Reference Si37 701 374 Appendix REMQ8PY1 3D055307E...
Страница 386: ...Si37 701 Wiring Diagrams for Reference Appendix 375 REMQ10 12PY1 3D055308E...
Страница 387: ...Wiring Diagrams for Reference Si37 701 376 Appendix REMQ14P 16PY1 3D055309E...
Страница 388: ...Si37 701 Wiring Diagrams for Reference Appendix 377 2 2 Field Wiring REYQ8P 10P 12P 14P 16PY1 3D057764...
Страница 389: ...Wiring Diagrams for Reference Si37 701 378 Appendix REYQ18P 20P 22P 24P 26P 28P 30P 32PY1 3D057762...
Страница 390: ...Si37 701 Wiring Diagrams for Reference Appendix 379 REYQ34P 36P 38P 40P 42P 44P 46P 48PY1 3D057763...
Страница 391: ...Wiring Diagrams for Reference Si37 701 380 Appendix 2 3 Indoor Unit FXCQ20M 25M 32M 63MVE 3D039556A...
Страница 392: ...Si37 701 Wiring Diagrams for Reference Appendix 381 FXCQ40M 50M 80M 125MVE 3D039557A...
Страница 393: ...Wiring Diagrams for Reference Si37 701 382 Appendix FXFQ25M 32M 40M 50M 63M 80M 100M 125MVE 3D039600A...
Страница 394: ...Si37 701 Wiring Diagrams for Reference Appendix 383 FXZQ20M 25M 32M 40M 50M8V1B 3D038359...
Страница 395: ...Wiring Diagrams for Reference Si37 701 384 Appendix FXKQ25MA 32MA 40MA 63MAVE 3D039564C...
Страница 399: ...Wiring Diagrams for Reference Si37 701 388 Appendix FXDYQ180M 200M 250MV1...
Страница 400: ...Si37 701 Wiring Diagrams for Reference Appendix 389 FXSQ20M 25M 32M 40M 50M 63M 80M 100M 125MVE 3D039561B...
Страница 401: ...Wiring Diagrams for Reference Si37 701 390 Appendix FXMQ40MA 50MA 63MA 80MA 100MA 125MAVE 3D039620B...
Страница 402: ...Si37 701 Wiring Diagrams for Reference Appendix 391 FXMQ200MA 250MAVE 3D039621B...
Страница 403: ...Wiring Diagrams for Reference Si37 701 392 Appendix FXHQ32MA 63MA 100MAVE 3D039801D...
Страница 404: ...Si37 701 Wiring Diagrams for Reference Appendix 393 FXAQ20MA 25MA 32MAVE 40MA 50MA 63MAVE 3D034206D...
Страница 406: ...Si37 701 Wiring Diagrams for Reference Appendix 395 2 4 BS Unit 3D055928C...
Страница 423: ...Piping Installation Point Si37 701 412 Appendix...
Страница 427: ...Example of Connection R 410A Type Si37 701 416 Appendix...
Страница 433: ...Method of Checking the Inverter s Power Transistors and Diode Modules Si37 701 422 Appendix...
Страница 447: ...Si37 701 iv Index...
Страница 451: ...Si37 701 viii Drawings Flow Charts...