SiK401004_A
63
INSTALLATION
7) Horizontal Survey of the Indoor Unit
After installation of the indoor unit is finished, horizontal survey of the complete unit
must be executed to confirm the horizontal placement of the unit, which is shown as
below:
Air Supply
Air Intake
i
Condensate Drainpipe
Level Instrument
Condensate Drainpipe
Enlarged View
As the inside of the unit is in the negative
pressure status, it is required to set up a
backwater elbow. The requirements is:
A=B
≥
P/10+20(mm)
P is the absolute pressure inside the unit.
The unit of the pressure is Pa.
Figure
1-1-6
1.1.4 Dimension Data
J
I
H
G
B
A
C
D
E
F
Figure
1-1-7
Содержание RY24PEV1K
Страница 1: ...SiK401004_A Duct type Applied Models Non Inverter Pair Cooling Only Non Inverter Pair Heat Pump...
Страница 12: ...SiK401004_A SPECIFICATIONS 4 2 NOMENCLATURE 24 E K M V1...
Страница 36: ...SiK401004_A SPECIFICATIONS 28 5 PIPING DIAGRAM...
Страница 80: ...SiK401004_A INSTALLATION 72 2 5 Installation Clearance Data Figure 2 5 1...
Страница 109: ...SiK401004_A 101 MAINTENANCE 3 WIRING DIADRAM 3 1 Wiring Diagram Outdoor Units 3 1 1 RY24PEV1K 6 3 6 2 5 3 6 5...
Страница 110: ...SiK401004_A MAINTENANCE 102 3 1 2 R24PEV1K 6 3 6 2 5 6 4 3...
Страница 111: ...SiK401004_A 103 MAINTENANCE 3 1 3 RY30PEV1K 6 3 6 2 5 3 6 6...
Страница 112: ...SiK401004_A MAINTENANCE 104 3 1 4 R30PEV1K 6 3 6 2 5 6 5 0...
Страница 113: ...SiK401004_A 105 MAINTENANCE 3 1 5 RY36PEY1K...
Страница 114: ...SiK401004_A MAINTENANCE 106 3 1 6 R36PEY1K L L...
Страница 115: ...SiK401004_A 107 MAINTENANCE 3 1 7 RY42PEY1K RY48PEY1K L L...
Страница 116: ...SiK401004_A MAINTENANCE 108 3 1 8 R42PEY1K R48PEY1K L L...