4
|
Components
Service manual
109
RXTM-R+RXTP-R+ARXTP-R+RXTA-B+FTXTA30B2V1B(W)
(B)+35M5V1B
R32 Optimized Heating 4 Split
ESIE21-12A – 2022.02
4.11 Indoor unit power PCB
4.11.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a power check of the indoor unit power PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
Turn ON the power of the unit.
2
Measure the voltage between the black and white wires of connector S101 on
the indoor unit power PCB.
Result:
The measured voltage MUST be 230 V AC.
a b
A
A
Indoor unit FTXTA-B
a
Black wire
b
White wire
a
A
b
A
Indoor unit FTXTM-R
a
Black wire
b
White wire
Содержание RXTA30B2V1B
Страница 262: ......
Страница 263: ......
Страница 264: ...ESIE21 12A 2022 02 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...