manualshive.com logo in svg
background image

INSTALLATION 

MANUAL

R410A Split Series

Installation manual

R410A Split series

English

Руководство  по монтажу

Русский

Models

  

RXB25B6V19

RXB35B6V19

Tanıtma ve Kullanma Kılavuzu

Türkçe

Серия R410A с раздельной установкой

R410A Split serisi

Содержание RXB25B6V19

Страница 1: ...INSTALLATION MANUAL R410A Split Series Installation manual R410A Split series English Models RXB25B6V19 RXB35B6V19 Tan tma ve Kullanma K lavuzu T rk e R410A R410A Split serisi...

Страница 2: ...3P291651 9T book Page 2 Tuesday December 9 2014 2 55 PM...

Страница 3: ...ificato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acordo com o Certificado C 09 A B C 10 Bem rk som anf rt i A og positivt vurderet af B i henhold til Certifikat C...

Страница 4: ...receive no external stresses Incomplete connections or clamping may cause terminal overheating or fire After connecting interconnecting and supply wiring be sure to shape the cables so that they do no...

Страница 5: ...t anything which must be kept away from moisture NOTE Cannot be installed hanging from ceiling or stacked CAUTION When operating the air conditioner in a low outdoor ambient temperature be sure to fol...

Страница 6: ...nal refrigerant required for refrigerant pipe exceeding 10m in length Be sure to add the proper amount of additional refrigerant Failure to do so may result in reduced perfomance The suggested shortes...

Страница 7: ...nit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necessary fo...

Страница 8: ...en tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torqu...

Страница 9: ...es from gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no...

Страница 10: ...al Polyethylene foam Heat transfer rate 0 041 to 0 052W mK 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reaches 110 C max Choose heat insulation materials that will withstand thi...

Страница 11: ...ss the operation select button to return the operation mode to cooling Test run mode will stop automatically after around 30 minutes To force a test run to stop press the operation stop button CAUTION...

Страница 12: ...atch Tighten the terminal screws securely We recommend a flathead screwdriver be used to tighten the screws The screws are packed with the terminal board Observe the notes mentioned below when wiring...

Страница 13: ...te OUTDOOR CONDENSER DISCHARGE Discharge Strip wire end to this point Excessive strip length may cause electrical shock or leakage Good Wrong Stripping wire at terminal block C1 C2 C400 C405 Capacitor...

Страница 14: ...l to ensure that all functions and parts such as louver movement are working properly The air conditioner requires a small amount of power in its standby mode If the system is not to be used for some...

Страница 15: ...R410A 3P291651 9T book Page 1 Tuesday December 9 2014 2 55 PM 1...

Страница 16: ...70 A A 1 B 1 3P291651 9T book Page 2 Tuesday December 9 2014 2 55 PM 2...

Страница 17: ...1 2 3 4 5 6 7 3 3 8 9 1 2 3 4 3P291651 9T book Page 3 Tuesday December 9 2014 2 55 PM 3...

Страница 18: ...250 4 1 5 15 9 5 6 4 20 12 15 10 1 5 1 5 470 96 300...

Страница 19: ...1200 8 10 20 1 1 2 2 1 2 30 3 50 100 1200 50 50 100 150 300 50 150 20 16 3P291651 9T book Page 5 Tuesday December 9 2014 2 55 PM 5...

Страница 20: ...A 5 6 4 1 2 R410A 3 3 4 A A 0 0 5 R410A 1 0 1 5 1 5 2 0 Imperial 3 8 1 4 32 7 39 9 14 2 17 2 333 407 144 175 3 8 1 4 21 6 27 4 21 6 27 4 220 280 220 280 10 8 14 7 110 150 3P291651 9T book Page 6 Tuesd...

Страница 21: ...7 5 1 R410A 2 3 R410A 4 R410A 4 1 2 Lo Hi 3 0 1 76 1 4 Lo 2 5 6 90 5 7 8 3P291651 9T book Page 7 Tuesday December 9 2014 2 55 PM...

Страница 22: ...8 1 2 2 4 6 R410A 1 R410A 15 10 3P291651 9T book Page 8 Tuesday December 9 2014 2 55 PM 7 7 1 1 2 7 2 1 0 041 0 052 0 035 0 045 C 110 C 2 3 9 5 6 4 12 15 8 10 10 30 0 8 C1220T O...

Страница 23: ...9 1 2 3 4 15 1 2 3 4 30 1 2 3P291651 9T book Page 9 Tuesday December 9 2014 2 55 PM WARNING 1 2 3 4 5 1 ISO 7010 W001 2 ISO 7010 W002 3 ISO 7000 0790 4 ISO 7000 1641 5 ISO 7000 1659 RU...

Страница 24: ...10 1 2 3 4 3 5 1 20 2 1 2 3 1 2 3 L N 16 10 2 0 H05RN 50 220 240 2 0 1 2 3 1 2 3 1 3 A B A B 3P291651 9T book Page 10 Tuesday December 9 2014 2 55 PM...

Страница 25: ...ENSER DISCHARGE C1 C2 C400 C405 V1R E1 E2 HL1 HN1 S HR1 HR2 FU2 FU3 IPM1 IPM2 L L1R M1C M1F K30R K10R MR4 N A1P PS Q1M R1T R2T R3T PTC S20 S30 S40 S71 S80 S90 F1S V2 V3 X1M Y1E Y1S Z1C Z2C Z3C 3P29165...

Страница 26: ...12 1 1 1 1 2 1 2 26 C 28 C 20 C 24 C 3 3 1 2 26 C 28 C 3 3 1 3 2 3P291651 9T book Page 12 Tuesday December 9 2014 2 55 PM...

Страница 27: ...nmaya elektrik arpmas na veya yang na yol a abilir ve d niteler aras ndaki elektrik ba lant lar i in belirtilen tipte kablolar kullan n Ara ba lant kablolar n u lar zerine harici bir kuvvet etki etmey...

Страница 28: ...kilde monte edin 2 D niteyi kesinlikle emi taraf n n do rudan r zgara bakaca bir yere monte etmeyin 3 R zgara maruziyeti engellemek i in d nitenin hava de arj taraf na bir oluklu plaka tak n 4 A r kar...

Страница 29: ...k Uzunlu u 10 m yi ge en so utucu ak kan borular i in gerekli ilave so utucu ak kan miktar Uygun miktarda ilave so utucu ak kan ekledi inizden emin olun Aksi takdirde performans d meydana gelebilir D...

Страница 30: ...ken Konumun Se ilmesine li kin nlemler ve D nite Montaj izimleri b l mlerine bak n 2 Tahliye al mas gerekiyorsa a a daki prosed rleri takip edin 2 Tahliye al mas Is pompas modelleri 1 Tahliye i in bir...

Страница 31: ...nlemek i in konik somunlar s karken tork anahtar kullan n Her iki koni in merkezini hizalay n ve konik somunlar elinizle 3 veya 4 tam tur evirerek s k n Ard ndan bunlar tork anahtarlar yla tamamen s...

Страница 32: ...vanas n n servis portuna ba lay n 2 G sterge manifoldunun al ak bas n vanas n Lo sonuna kadar a n ve y ksek bas n taraf n Hi sonuna kadar kapat n Y ksek bas n vanas i in daha sonra bir i lem yap lmas...

Страница 33: ...aksa u hususlara dikkat edin 1 Yal t m malzemesi Polietilen k p k Is transfer h z 0 041 0 052W mK 0 035 0 045kcal mh C So utucu gaz borusunun y zey s cakl maksimum 110 C ye ula r Bu s cakl a dayanabil...

Страница 34: ...duna getirmek i in al t rma se imi d mesine bas n Test i letimi modu yakla k 30 dakika sonra otomatik olarak durur Bir test i letimini zorlamal durdurmak i in al t rma durdurma d mesine bas n KAZ 1 D...

Страница 35: ...idalar n sa lam ekilde s k n Vidalar n s k lmas i in d z u lu bir tornavida kullan lmas nerilir Vidalar terminal kart yla birlikte gelir G kayna terminal kart nda kablolama yaparken a a daki notlara d...

Страница 36: ...n OUTDOOR CONDENSER DISCHARGE De arj Kablo ucunu bu noktaya kadar s y r n A r uzunlukta s yr l rsa elektrik arpmas na veya ka a a neden olabilir Do ru Yanl Telin terminal blo unda s yr lmas C1 C2 C400...

Страница 37: ...ar n do ru ekilde al t ndan emin olmak i in test al t rmas n kullan m k lavuzuna uygun olarak ger ekle tirin Klima bekleme modunda az miktarda g gerektirir Sistem montaj sonras bir s re kullan lmayaca...

Страница 38: ...3P291651 9T book Page 1 Tuesday December 9 2014 2 55 PM...

Страница 39: ......

Страница 40: ...pyright 2018 Daikin DAIKIN ISITMA VE SO UTMA S STEMLER SAN T C A K kbakkalk y Mah Kay da Cad No 1 Kat 21 22 34750 Ata ehir ISTANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0...

Отзывы: