ROTEX Heating Systems GmbH
10
4
INSTALLATION
4.1
Installation measurements
Unit with pipes connected downwards:
Unit + mounting bracket
A = Supply CH
G ¾” (ext)
B = Return CH
G ¾” (ext)
C = Gas
G ½” (int)
D = Condense outlet
Ø dn25 (flexible)
h =
517mm
RHOB12AAV1H &
RHOB18AAV1H
637mm
RHOB42AAV1H
H =
590mm
RHOB12AAV1H &
RHOB18AAV1H
710mm
RHOB42AAV1H
Z = Flue gas outlet/air inlet Ø60/100 (concentric)