
IM 926-3 • ROOFPAK APPLIED SYSTEMS 54 www.DaikinApplied.com
Preparing Unit for Operation
Preparing Unit for Operation
Spring Isolated Fans
Releasing Spring Mounts
WARNING
Moving machinery hazard. Can cause severe injury or
death. Before servicing equipment, disconnect power and
lock off. More than one disconnect may be required to de-
energize unit.
The optional spring-mounted supply and return fans are locked
down for shipment. Hold-down fasteners are located at each
spring mount. Remove these fasteners before operating the
fans.
shows a typical spring mount. Note that the
3/8" hold-down bolt securing the fan base to the unit cross
.
After removing the hold-down fasteners, rock the fan assembly
by hand to check for freedom of movement.
Figure 74: Spring Mount
Figure 75: RDT Spring Mount Hold-Down Fasteners
Figure 76: Spring Mounted Hold-Down Fasteners, All Units
Figure 77: Fan Spring Mount Adjustment
* Grossly out-of-adjustment thrust restraints can affect this dimension. Recheck
after thrust restraints are adjusted.
Hold-down
fasteners
Hold-down
fasteners
This bracket is added,
and these 3/8" tie downs
are used for RDS 800C.
This bracket is added,
and these 3/8" tie downs
are used for RDS 800C.
3 /8 " ± 1 /4 "
with fan running
Leveling
screw
Spring
mount
assembly
Cross
channel
Jam nut
Fan base
Содержание RoofPak RPS Series
Страница 71: ...Wiring Diagrams www DaikinApplied com 71 IM 926 3 ROOFPAK APPLIED SYSTEMS Figure 87 VFD Control SAF and RAF...
Страница 72: ...IM 926 3 ROOFPAK APPLIED SYSTEMS 72 www DaikinApplied com Wiring Diagrams Figure 88 VAV Control Inputs...
Страница 76: ...IM 926 3 ROOFPAK APPLIED SYSTEMS 76 www DaikinApplied com Wiring Diagrams Figure 90 Electric Heat Control...
Страница 129: ......