Mechanical Installation
www.DaikinApplied.com 23
IM 926-3 • ROOFPAK APPLIED SYSTEMS
Post and Rail Arrangement
CAUTION
When welding unit to the curb, do not damage wiring (control
panel side). Weld ONLY in the specified zone in the acceptable
weld zone (see
). Welding must comply with weld
fillet size, etc. as indicated in
.
1.
Set the rooftop unit on the rails. The rails should run
lengthwise and support the entire unit base.
2.
Weld both sides of the unit directly to each rail as shown
in
. The total number of welds
required is dependent on the length of the unit.
a.
Make the fillet welds 2 inches long, spaced 48
inches apart on centers.
b.
Place the end welds 6 to 12 inches from the unit
edge.
NOTE:
High temperature insulation is installed at the factory
to allow for field welding along the lower front edge
region of the unit base.
Figure 33: Welding of Unit to Rail—Unit Base, Cross-Sectional View
Figure 34: Weld Locations for Rail Arrangement
2–48
Rail
.25
Unit power wiring
(by factory)
Unit control wiring
(by factory)
High temp
insulation
Rail
Acceptable weld zone
Field attachment
weld
Weld
zone
.50"
Unit base
Unit base
6–12"
2–48
Rooftop unit
.25
Weld every 48"
6–12"
Rails
Содержание RoofPak RPS Series
Страница 71: ...Wiring Diagrams www DaikinApplied com 71 IM 926 3 ROOFPAK APPLIED SYSTEMS Figure 87 VFD Control SAF and RAF...
Страница 72: ...IM 926 3 ROOFPAK APPLIED SYSTEMS 72 www DaikinApplied com Wiring Diagrams Figure 88 VAV Control Inputs...
Страница 76: ...IM 926 3 ROOFPAK APPLIED SYSTEMS 76 www DaikinApplied com Wiring Diagrams Figure 90 Electric Heat Control...
Страница 129: ......