
k
eyPad
/d
IsPlay
M
enu
s
TruCTure
www.DaikinApplied.com 115
IM 893-10 • ROOFPAK SINGLEZONE UNITS
For more detail go to:
pages 122–123
For more detail go to:
pages 118–121
For more detail go to:
page 126
Manual Control
Manual Control= Normal
CFan Outpt 1= Off
Supply Fan= Off
CFan Outpt 2= Off
SAF Spd Cmd= 0%
CFan Outpt 3= Off
Manual Ctrl= Normal
BP/WR Valve= 0%
Supply Fan= Off
CW Valve= 0%
SAF Spd Cmd= 0%
ExhFan Out 1= Off
INV/OF Ena= Off
ExhFan Out 2= Off
INV Cmp= Off
ECond VFD= Off
INV Cmp Cmd= 0%
ECFan Spd Cmd= 0%
Comp 3= Off
EC Dm Valve= Close
OA Fan= Off
Sump Pump= Off
OA Fan Cmd= 0%
Sep Flsh Vlv= Off
4 Way Valve= Off
SV1= Off
RcvSol Valve=Off
SV2= Off
BP Sol Valve= Off
Gas Htg On/Off= Off
EVI Cmd= 0%
Htg Valve= 0%
EVO Cmd= 0%
SCR Out= 0%
RF/EF Fan= Off
F&BP Damper= 0%
RF/EF Spd Cmd= 0%
Htg Stg 1= Off
OAD/Econo= 0%
SCR Ena 1= Off
OAD OpCl= Close
Htg Stg 2= Off
Var Cmp= Off
SCR Ena 2= Off
Var Cmp Cmd= 0%
Htg Stg 3= Off
VCmp Emg Stop= Nrml
Htg Stg 4= Off
Comp 1= Off
Htg Stg 5= Off
Comp 2= Off
Htg Stg 6= Off
Comp 3= Off
Reheat Valve= 0%
Comp 4= Off
RH Output= Off
Comp 5= Off
LSCRH Valve= Off
Comp 6= Off
HGBP Valve= Off
Comp 7= Off
ERec Wheel= Off
Comp 8= Off
ER Whl Cmd= 0%
U1 Comp 1= Off
ERBP Dmpr Cl= Off
U1 Comp 2= Off
ERBP Dmpr Op= Off
U2 Comp 1= Off
Cond Wtr Pump= Off
U2 Comp 2= Off
Alm Output= Off
Cond Sol 1= Off
Fan Op Out= Off
Cond Sol 2= Off
Unit Maintenance
Operating Hours
Commission Unit
Unit Set-Up
►
Timer Settings
►
SAF Set-Up
►
RF/EF Set-Up
►
Htg/Clg ChgOvr Set-Up
►
Cooling Set-Up
►
INV Cmp Set-Up
►
Var Cmp Set-Up
►
Econo Set-Up
►
Min OA Set-Up
►
Heating Set-Up
►
OA Fan Set-Up
►
Exp Valve Set-Up
►
Defrost Set-Up
►
Dehum Set-Up
►
Energy Rec Set-Up
►
Head Pressure Set-Up
►
Evap Cond Set-Up
►
D3 Set-Up
►
Alarm Configuration
►
Service Menus
Timer Settings
►
Operating Hours
►
Save/Restore Settings
►
Active Alarms
►
Alarm Log
►
Alarm Configuration
►
Analog Input Status
►
Universal I/O Status
►
Digital Input Status
►
Digital Output Status
►
Network Input Status
►
Modbus Status
►
D3 Status
►
Sensor Offsets
►
Reset Counter= XXXX
Trending
Trending Ena= No
Apply Chgs= No
Sample Time= 300s
TrendOnOff= Off
Export Data= No
Clear Trend= Done
Points 1–8 (Fixed)
►
Points 9–24 (from List)
►
Points 25–27 (with IDs)
►
Points 28–30 (with IDs)
►
Содержание RDT
Страница 60: ...IM 893 10 ROOFPAK SINGLEZONE UNITS 60 www DaikinApplied com Wiring Diagrams Figure 64 VFD Control SAF and RAF...
Страница 61: ...Wiring Diagrams www DaikinApplied com 61 IM 893 10 ROOFPAK SINGLEZONE UNITS Figure 65 VAV Control Inputs...
Страница 65: ...Wiring Diagrams www DaikinApplied com 65 IM 893 10 ROOFPAK SINGLEZONE UNITS Figure 67 Electric Heat Control...