![Daikin Multi+ R32 Split Series Скачать руководство пользователя страница 71](http://html1.mh-extra.com/html/daikin/multi-r32-split-series/multi-r32-split-series_installers-reference-manual_4701102071.webp)
16
|
Disposal
Installer reference guide
71
4MWXM-A9
R32 Split series
4P708645-1 – 2022.09
5
After 2-3 minutes, close the both gas stop valves and stop forced cooling.
a
c
b
d
d
e
a
Gas stop valve
b
Closing direction
c
Hexagonal wrench
d
Valve cap
e
Liquid stop valve
16.3 To start and stop forced cooling
1
Turn OFF the power, remove the service cover and the switch box cover and
the service PCB switch cover.
2
Set DIP switch SW5 and SW6 to OFF.
3
Set DIP switch SW2 to COOL.
2
1
1×
1
OFF
ON
4
3
2
1
2
1
4
3
2
1
HEAT
COOL
A
1
2
3
4
5
2
3
SW6
SW2
SW5
4
Reattach the service PCB switch cover.
5
Turn ON the outdoor unit.
6
Press the forced cooling operation switch SW1 to begin forced cooling.
7
Press the forced cooling operation switch SW1 to stop forced cooling.
1×
4
A
1
2
3
4
5
7
SW1
6
5
=
8
Close switch box cover and service cover.
Содержание Multi+ R32 Split Series
Страница 1: ...Installer reference guide R32 Split series 4MWXM52A2V1B9...
Страница 31: ...6 Unit installation Installer reference guide 31 4MWXM A9 R32 Split series 4P708645 1 2022 09...
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ...4P708645 1 2022 09 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...