Finishing the outdoor unit installation
Installer reference guide
54
4MWXM-A9
R32 Split series
4P708645-1 – 2022.09
10 Finishing the outdoor unit installation
10.1 To finish the outdoor unit installation
DANGER: RISK OF ELECTROCUTION
▪
Make sure that the system is earthed properly.
▪
Turn OFF the power supply before servicing.
▪
Install the switch box cover before turning ON the power supply.
NOTICE
It is recommended that the refrigerant piping between indoor and outdoor unit is
installed in a ducting or the refrigerant piping is wrapped with finishing tape.
1
Insulate and fix the refrigerant piping and cables as follows:
g
b
a
f
e
c
d
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Field wiring (if applicable)
e
Liquid pipe
f
Liquid pipe insulation
g
Finishing tape
2
Install the service cover.
10.2 To close the outdoor unit
1
Close the switch box cover.
2
Close the service cover.
3×
1×
Содержание Multi+ R32 Split Series
Страница 1: ...Installer reference guide R32 Split series 4MWXM52A2V1B9...
Страница 31: ...6 Unit installation Installer reference guide 31 4MWXM A9 R32 Split series 4P708645 1 2022 09...
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ...4P708645 1 2022 09 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...