3-45
After replacing controller, the initial setting and software up-grade are required with following notes.
2. Initial setting to spare controller
Refer the initial setting work to attached [Initial setting procedure for spare controller DECOS
Ⅲ
d,
Ⅲ
c,
Ⅲ
b].
※
1 Set controller type DECOS
Ⅲ
"d" and other items by referring to attached [Initial Setting Table for
Spare Controller DECOS
Ⅲ
d].
※
2 Set controller type DECOS
Ⅲ
"c" and other items by referring to attached [Initial Setting Table for Spare
Controller DECOS
Ⅲ
c].
※
3 Set controller type DECOS
Ⅲ
"b" and other items by referring to attached [Initial Setting Table for
Spare Controller DECOS
Ⅲ
b].
※
4 Set controller type DECOS
Ⅲ
"c", FA SEN "OFF" and other items by referring to attached [Initial
Setting Table for Spare Controller DECOS
Ⅲ
c].
※
5 Set controller type DECOS
Ⅲ
"b", FA SEN "OFF", REHEAT "OFF" and other items by referring to
attached [Initial Setting Table for Spare Controller DECOS
Ⅲ
b].
3. Up-grade to the latest software
After replacing controller with spare parts, install the latest software for up-grading.
Download the latest software from DAIKIN HOME PAGE as follows.
The unit can be operated with factory installed software loaded in the spare controller.
However Daikin requests to up-grade the software to the latest version for the best operation.
LXE10E-1,LXE10E-A & LXE10D
LXE10E-1
LXE10E-A
LXE10D
--- I.D. & PASSWORD are requested.
CONTAINER REFRIGERATION UNIT
DOWNLOAD
'http//www.daikin.com/service
※
1,
※
4,
※
5
※
2
※
3
Up-grade procedure
for latest software version
※
1,
※
2, --
※
5 show
numbers described
above.
DAIKIN
Download the
latest software
Install the latest software
03̲LXE10E-A(33-47) 07.2.23 2:21 PM ページ 3-45
https://daikin-p.ru
Содержание LXE10E-A
Страница 142: ...5 7 An example of installation of CA devices inside q TransFRESH ASS Y A4 A5 CABLES W MOUNTING BOX q https daikin p ru...
Страница 177: ...7 8 https daikin p ru...
Страница 178: ...7 13 Schematic wiring diagram Connector type terminal board and rechargeable battery 7 9 https daikin p ru...
Страница 180: ...7 11 7 15 Schematic wiring diagram Connector type terminal board temperature recorder and dry battery https daikin p ru...
Страница 220: ...8 37 2 2 Inside 1 q Reheat coil https daikin p ru...
Страница 232: ...8 49 An example of installation of CA devices inside q TransFRESH ASS Y A4 A5 CABLES W MOUNTING BOX q https daikin p ru...
Страница 237: ...MEMO https daikin p ru...