3-6
3.3 Operation procedure
3.3.1 Operation procedure flow chart
S
S
M
M
I/O ON
I/O
OFF
S
I/O : Unit On / Off key
: S key
: Select key
: Enter key
: 8 / Chart key
CHART
CHART
CHART
CHART
CHART
Power off
Unit off
All Lighting
(for 3 sec.)
Preparation
(for 18 sec.)
Current
indication
※
1
No key operation for 30 sec.
Circuit Breaker ON
※
3 Battery mode
for 3 sec.
※
2 Operation Setting (Set Point ˚C, Humidity %, Defrost Internal)
※
6 Sensor Indication
Chart Indication
(Refer to page3-60)
※
14 Downloading from controller
※
5 LED Display Light OFF.
(See note 1.)
※
7 Temperature
Record Scroll
※
8 Alarm
Record Scroll
or no key operation for 5 min.
or no key operation for 5 min.
or no key operation for 5 min.
※
4 G-Set
MODE
※
4 Automatic pump down
MODE
PTI
Refer to
page 3-54
Note 1.
※
5 activates when the "dISP" in
※
11 is set to "ON" in controller initial setting in page 3-28.
Refer to page 3-32.
I/O
for 3 sec.
Circuit Breaker OFF after setting change
(
OFF when no setting change
)
for 3 sec.
for 3 sec.
for 3 sec.
※
10
Optional
Function
Setting
※
11
Basic
Function
Setting
※
12
Optional
Condition
Setting
※
13
Input
Data
※
4 Mode Operation
M
MODE
03̲LXE10E-A(1-14) 07.2.19 4:53 PM ページ 3-6
https://daikin-p.ru
Содержание LXE10E-A
Страница 142: ...5 7 An example of installation of CA devices inside q TransFRESH ASS Y A4 A5 CABLES W MOUNTING BOX q https daikin p ru...
Страница 177: ...7 8 https daikin p ru...
Страница 178: ...7 13 Schematic wiring diagram Connector type terminal board and rechargeable battery 7 9 https daikin p ru...
Страница 180: ...7 11 7 15 Schematic wiring diagram Connector type terminal board temperature recorder and dry battery https daikin p ru...
Страница 220: ...8 37 2 2 Inside 1 q Reheat coil https daikin p ru...
Страница 232: ...8 49 An example of installation of CA devices inside q TransFRESH ASS Y A4 A5 CABLES W MOUNTING BOX q https daikin p ru...
Страница 237: ...MEMO https daikin p ru...