Part
3. Commissioning Procedure
102
Design Guide
DCM014A51
Part 3. Commissioning Procedure
1. Site Visit
1.1 Obtaining Object Information
Initializing the configure BACnet® Server Gateway CSV file is required before the test operation.
Gather the object information listed below ([1] - [6])
before visiting the site. Obtain this
information from
the Daikin sales person or Sales Representative for the object
. (Fill in the
information related to the object in the blank space of [1] - [6].)
1. Confirmation of communication method between the
iTM
and the BMS front end:
Communication method between the
iTM
and the BMS front end.
No.
Communication Method
Communication method for the objects
1
BACnet
/ IP communication
2. BACnet® communication port number:
Note: The factory setting is 47808. The available setting range is 1 - 65535.
BACnet
communication port number
3. Device ID (instance number) for each
VRV
indoor unit:
Note: The available setting range is 0 - 4194303 there is no factory setting assigned.
DIII-Net
Group
Address
Device ID
(Instance #)
DIII-Net
Group
Address
Device ID
(Instance #)
DIII-Net
Group
Address
Device ID
(Instance #)
DIII-Net
Group
Address
Device ID
(Instance #)
1:1-00
1:2-00
1:3-00
1:4-00
1:1-01
1:2-01
1:3-01
1:4-01
1:1-02
1:2-02
1:3-02
1:4-02
1:1-03
1:2-03
1:3-03
1:4-03
1:1-04
1:2-04
1:3-04
1:4-04
1:1-05
1:2-05
1:3-05
1:4-05
1:1-06
1:2-06
1:3-06
1:4-06
1:1-07
1:2-07
1:3-07
1:4-07
1:1-08
1:2-08
1:3-08
1:4-08
1:1-09
1:2-09
1:3-09
1:4-09
1:1-10
1:2-10
1:3-10
1:4-10
1:1-11
1:2-11
1:3-11
1:4-11
1:1-12
1:2-12
1:3-12
1:4-12
1:1-13
1:2-13
1:3-13
1:4-13
1:1-14
1:2-14
1:3-14
1:4-14
1:1-15
1:2-15
1:3-15
1:4-15