2-2 OPTIONAL ACCESSORIES
•
This indoor unit separately requires a decoration panel and a
remote controller.
•
Confirm if a decoration panel shown in the Table 1 is
prepared and meets your model.
(Refer to the installation manual attached to the decoration
panel for how to install.)
Table 1
Unit model
Optional decoration panel
FXFQ25 · 32 · 40 · 50 · 63 ·
80 · 100 · 125SVM
BYCQ125B-W1
Color : Fresh white
•
There are 2 kinds of remote controller; wired type and
wireless type.
Install the remote controller to the place where the customer
has given consent.
Refer to the catalog for the applicable model.
(Refer to the installation manual attached to the remote
controller for how to install.)
CARRY OUT THE WORK GIVING CAUTION
TO THE FOLLOWING ITEMS AND AFTER THE
WORK IS COMPLETED CHECK THESE AGAIN.
1.
Items to be checked after the installation work is
completed
Items to be checked
In case of defective
Check column
Are the indoor and outdoor
units rigidly fixed?
Drop · vibration ·
noise
Are the installation works of
the outdoor and indoor units
completed?
Does not operate ·
burnout
Have you carried out a
leakage test with the test
pressure specified in the
outdoor unit installation
manual?
Does not cool / Does
not heat
Is the insulation of
refrigerant piping and drain
piping completely carried
out?
Water leakage
Does the drain flow out
smoothly?
Water leakage
Is the power supply voltage
identical to that stated in the
manufacturer’s label on the
air conditioner?
Does not operate ·
burnout
Are you sure that there is no
wrong wiring or piping or no
loose wiring?
Does not operate ·
burnout
Is earthing completed?
Danger in case of
leakage
Are the sizes of electric
wiring according to the
specification?
Does not operate ·
burnout
Is any of air outlets or
inlets of the indoor and
outdoor units blocked with
obstacles?
(It may lead to capacity drop
due to fan speed drop or
malfunction of equipment.)
Does not cool /
Does not heat
Have you recorded the
refrigerant piping length
and the refrigerant charge
added?
Refrigerant charge
amount is not clear
Make sure to recheck the items of “SAFETY PRECAUTIONS”.
2.
Items to be checked at delivery
Items to be checked
Check column
Have you carried out field setting? (if necessary)
Are the control box lid, the air filter and the suction
grille attached?
Does the cool air discharge during the cooling
operation and the warm air discharge during the
heating operation? Does the indoor unit makes
unpleasant sound of air discharge?
Have you explained how to operate the air
conditioner showing the operation manual to the
customer?
Have you explained the description of cooling,
heating, program dry and automatic (cooling/
heating) given in the operation manual to the
customer?
If you set the fan speed at thermostat OFF, did you
explain the set fan speed to the cus tomer.
Have you handed the operation manual and the
installation manual to the customer?
Points of the operation explanation
In addition to the general usage, since the items in the
operation manual with the
WARNING and
CAUTION marks are likely to result in human bodily
injuries and property damages, it is neces sary not only
to explain these items to the customer but also to have
the customer read them.
3. SELECTION OF INSTALLATION LOCATION
Hold the hangers at 4 locations to move the indoor unit
when unpacking or after unpacked, and do not apply force
to the piping (refrigerant and drain) and resin parts.
If the temperature and humidity in the ceiling is likely to
exceed 30°C, RH80%, use the optional kit for coping with
high temperature and humidity, or additionally stick the
insulation to the indoor unit.
Use the insulation such as glass wool or polyethylene
that has thickness of 10 mm or more. However, keep the
insulated outside dimension smaller than the ceiling
opening so that the unit may go through the opening at
installation.
The direction of air discharge for this product can be
selected. Sealing material of air discharge outlet is
available option for 4-way with sealed corners, and 3-way.
(1) Select the installation location that meets the following
conditions and get approval of the cus tomer.
•
Where the cool and warm air spreads evenly in the
room.
•
Where there is no obstacles in the air passage.
•
Where drainage can be ensured.
•
Where the ceiling lower surface is not remarkably
inclined.
•
Where there is sufficient strength to withstand the mass
of the indoor unit. (If the strength is insufficient, the in
-
door unit may vibrate and get in contact with the ceiling
and generate unpleasant chattering noise.)
•
Where a space sufficient for installation and service can
be ensured.
(Refer to Fig. 1)
•
Where the piping length between the indoor and the out-
door units is ensured within the allowable length. (Refer
to the installation manual attached to the outdoor unit.)
•
Where there is no risk of flammable gas leak.
3
3P335596-2D English