16
|
Unit installation
Installer and user reference guide
54
FXAA15~63AUV1B
VRV system air conditioner
4P622295-1A – 2020.10
2
Use the paper pattern for installation (accessory).
3
Choose position for piping (for bottom or side piping see
56]):
a
b
c
d
e
f
a
Right piping
b
Bottom-right piping
c
Back-right piping
d
Bottom-left piping
e
Back-left piping
f
Left piping
4
Attach the mounting plate on the wall and install it temporarily.
5
Level the mounting plate (use tabs on the mounting plate).
6
Mark the centers of the drilling points on the wall using a tape measure.
Position the end of tape measure at symbol " ".
7
Finish the installation by securing the mounting plate on the wall:
▪
When using M4×25L screws (accessory): use 8 screws for FXAA15~32 or 9 screws
for FXAA40~63. Install evenly at least 4 screws on each side.
▪
When using bolts (
Example:
for concrete wall): use M8~M10 bolts (field supply)
one for each side.
INFORMATION
The removed pipe port cover can be kept in the mounting plate pocket.
A
44
162.5
337.5
299.5
60
98
44
290
107
62
75
100
795
217
236
(mm)
b
c
c
d
e
d
e
g
h
f
a1
a1
a2
a2
i
Содержание FXAA15AUV1B
Страница 86: ......
Страница 87: ......
Страница 88: ...4P622295 1A 2020 10 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...