System Configuration
Si01-406
50
System Configuration
1. System Configuration
After the installation and test operation of the room air conditioner have been completed, it
should be operated and handled as described below. Every user would like to know the correct
method of operation of the room air conditioner, to check if it is capable of cooling (or heating)
well, and to know a clever method of using it.
In order to meet this expectation of the users, giving sufficient explanations taking enough time
can be said to reduce about 80% of the requests for servicing. However good the installation
work is and however good the functions are, the customer may blame either the room air
conditioner or its installation work because of improper handling. The installation work and
handing over of the unit can only be considered to have been completed when its handling has
been explained to the user without using technical terms but giving full knowledge of the
equipment.
Содержание FT25CV1A
Страница 7: ...Si01 406 vi Table of Contents...
Страница 15: ...Functions Si01 406 4 List of Function...
Страница 21: ...Specifications Si01 406 10 Specifications...
Страница 31: ...Printed Circuit Board Connector Wiring Diagram Si01 406 20 Printed Circuit Board Connector Wiring Diagram...
Страница 189: ...R50 60CV1A Si01 406 178 Removal Procedure 6 Remove the screw 7 Take off the electrical parts box Step Procedure Points...
Страница 205: ...Wiring Diagrams Si01 406 194 Appendix...
Страница 209: ...Si01 406 iv Index...