Operation Flow Chart
ESIE15-13C
30
Function and Control
2. Operation Flow Chart
2.1
Cooling / Dry Operation
Power supply ON
Initialize electronic expansion valve
Initialize micro-computer
Preheating operation control
Remote controller operation
judgement
Operation mode
judgement
Cooling/Dry
Heating
Emergency
operation
Thermostat ON judgement
Starting control four way
valve changeover
· Compressor step control
· Electronic expansion valve PI control
· Low pressure protection control
· High pressure protection control
· Discharge pipe temperature protection control
· Inverter current protection control
· Low outdoor temperature cooling control
· Overall current protection control
· Simulated operation
Normal control
Oil recovery
operation starting
judgement
Oil recovery
operation
Oil recovery
operation ending
judgement
Remote
control
operation OFF
judgement
Standby
judgement
Abnormal stop
judgement
Thermostat OFF judgement
Room thermostat control
Thermostat OFF by freeze-up
protection
Restart standby
A
B
B
A
Cooling/Dry
Emergency
Heating
Содержание FHQ100CAVEB
Страница 2: ......
Страница 6: ...ESIE15 13C iv Table of Contents...
Страница 14: ...Introduction ESIE15 13C xii...
Страница 18: ...Outlook Outdoor Units ESIE15 13C 4 General Information 2 Outlook Outdoor Units...
Страница 22: ...Operating range ESIE15 13C 8 General Information...
Страница 108: ...Emergency Operation ESIE15 13C 94 Field Setting...