25
Ducted Air Conditioners
Installation Manual
•
Reassemble the fan deck and heat exchanger compartments in the following order:
9) Carefully place the fan deck back in the position.
10) Secure the fan deck onto the heat exchanger compartment with the (4) M8 bolts. (Fig. 21)
11) Carefully replace the fan deck compartment, taking care not to damage the fan motor wiring. (Fig. 20)
12) Secure the fan deck compartment with (4) M6 bolts bolt. (Fig. 20)
13) Pass the (2) thermistor cables through the rubber bush on the electric box and plug in the respective
sockets (X18A, X17A - only for FDYQ71LB1 & FDYQN100LBV1 models) (Fig. 21)
14) Dress fan motor lead on wire clip provided on the base panel.
15) Reconnect the fan motor connector back to the fan harness.
16) Replace the electrical box and secure onto the fan deck compartment with (4) screws. (Fig. 20)
17) Replace the electrical box cover and secure it with (2) screws. (Fig. 20)
Содержание FDYQ100LBV1
Страница 2: ......
Страница 18: ...17 Ducted Air Conditioners Installation Manual OTHER SETTINGS Applicable to all models...
Страница 27: ...26 Ducted Air Conditioners Installation Manual...