English
7
(2) Use suspension bolts for installation. Check if the location for the installation is strong enough to support
the weight of the unit, reinforce it if necessary, and install using suspension bolts.
4. PREPARATIONS BEFORE INSTALLATION
(1) Check the positional relationship between the ceiling opening hole and the hanging bolt of the unit.
•
For the maintenance, inspection, and other servicing purposes of the control box, prepare one of the
following service spaces.
1. Inspection hatch 1 (450 × 450) for the control box and a minimum space of 300 mm for the lower part
of the product.
(Refer to Fig. 3)
2. Inspection hatch 1 (450 × 450) for the control box and inspection hatch 2 for the lower part of the
product (see axial direction view A-1).
(Refer to Fig. 4)
3. Inspection hatch 3 for the lower part of the product and the lower part of the control box (see axial
direction view A-2).
(Refer to Fig. 4)
(length: mm)
Ceiling
Floor surface
* The H1 dimension indicates the height of the
product.
* Determine the H2 dimension by maintaining
a downward slope of at least 1/100 as
specified in “7. DRAIN PIPING WORK”.
Min
. 20
Min
. 300
Min
. 450
Min
. 2500
Min. 700 (service space)
(If no ceiling board is pr
ovided.)
*H1=300
*H2=Min
. 620
[Required installation place]
Fig. 2
The dimensions indicate the
minimum required space of
installation.
700
631
(Hanging bolt pitch)
Inspection hatch 1
(450×450)
Inspection hatch
Control box
Control box
Ceiling
B
C
(Hanging bolt pitch)
Bottom of unit
Air inlet
Air outlet
Hanging bolt (× 4)
*H3=Min
. 300
Fig. 3
Case 1
01_EN_3PN06583-10W.fm Page 6 Thursday, March 24, 2011 9:03 AM
Содержание FBQ20DAVMK
Страница 30: ...MEMO...
Страница 31: ...FBQ20DAVMK FBQ24DAVMK FBQ36DAVMK FBQ45DAVMK FBQ48DAVMK...
Страница 32: ...2 1 1...
Страница 33: ...3 1 1 2 2 3 3 4 4 R410A SUNISO R410A R410A 33 3 3 R407C 40 4 0 R410A R410A...
Страница 34: ...4 2 R410A 1 2 1 1 2 3 1 1 1 M5 16 24 20 18 48 45 36 26 4 5 1 6 2 7 8 9 10 11 12 9 4 2 8 2 13 2 M4 8...
Страница 35: ...5 2 2 BRC1C61 BRC4C62 13 1 1...
Страница 36: ...6 3 2 1 3 80 10 1 2 1 1...
Страница 39: ...9 5 1 11 9 11 5 2 3 4 4 11 9 5...
Страница 40: ...10 6 C 120 RH 80 C 30 20 R410A R410A 1 6 1 4 3 7 1 6 7...
Страница 42: ...12 4 4 8 8 7 7 8 9...
Страница 43: ...13 9 0 02 BCuP 2 JIS Z 3264 B Cu93P 710 795 ISO 3677 7 1 2 25 32 100 1 1 5 1 1 2 2 1 1 4 4 100 1 1 2...
Страница 44: ...14 2 3 4 100 1 100 1 2 1 5 1...
Страница 45: ...15 6 2 1 8 25 50 11 3 3 6 1 4 3 3...
Страница 46: ...16 9 230 ASSY 10 1 10 1 3...
Страница 47: ...17 2 50 X2M...
Страница 48: ...18 3 140 125 10 15 8 X1M 8 X2M 4 10...
Страница 49: ...19 12 5 8 13 8 12 13 0 96 0 80 1 44 1 18 1 44 1 18...
Страница 50: ...20 2 2 2 36 24 20 4 2 5 48 45 4 2 1 25 0 75 500 15 2 1 1 16 1 10 14 1 2 2 16 1 10 230 60...
Страница 51: ...21 9 1 2 10 P1 P2 2 2 1 2 2 1 12 1 1 2 2 16 16 10 2 P 1 P 2 P 1 P 1 2 11 12...
Страница 52: ...22 S 2 13 M 9 3 P1 P2 2 4 11 11 12 13 1 1 2 2 14...
Страница 53: ...23 1 1 2 2 1 2 L H 3 7 11 21 03 3 21 11 7 01 02 03 02 21 4 02 3 3...
Страница 55: ...25 12 00 00 10 4 1 12 6 6 88 88 90 88 90...
Страница 56: ...26 1 1 1 2 2 2 2 0 1 2 3 6 3 1 1 3 2 4 5 6 1 5 2 00 2 12 A1 A3 A6 A8 AF AH AJ C1 C4 C6 C9 CC CJ E0 E1...
Страница 57: ...27 E3 E4 E5 E7 E9 F3 H3 H7 H9 J1 J2 J3 J5 J6 J7 J8 J9 JA JC L1 L4 L5 L8 L9 LC P1 P3 P4 PJ U0 U1 L3 L2 L1 U2...
Страница 58: ...28 U4 UF UF U5 U8 UA UC UJ 5...
Страница 59: ......
Страница 60: ...3P370016 1 M14N008 HT 00_CV_3PN06583 10W fm Page 2 Thursday March 24 2011 8 56 AM http www daikin com global_ac...