
22
English
10-6 COMPUTERISED CONTROL (FORCED OFF AND ON/OFF OPERATION)
(1)
Wire specifications and how to perform wiring (Refer to Fig. 30)
•
Connect input from outside to terminals T1 and T2 of the terminal block for remote controller.
(There is no polarity.)
Table 10
(2)
Actuation
•
The following Table 11 explains FORCED OFF and ON/OFF OPERATIONS in response to Input A.
Table 11
(3)
How to select FORCED OFF and ON/OFF OPERATION
•
Turn on the power and then use the remote controller to select operation.
•
Change the SECOND CODE NO.
(Refer to Table 12)
(SECOND CODE NO. is factory set to “01” for FORCED OFF.)
Table 12
Wire specification
Sheathed vinyl cord or cable (2 wire)
Gauge
0.75 - 1.25 mm
2
Length
Max. 100 m
External terminal
Contact that can ensure the minimum applicable load of 15 V DC, 10 mA.
FORCED OFF
ON/OFF OPERATION
Input “ON” stops operation (impossible by remote controllers.)
Input OFF
→
ON turns ON unit.
Input OFF enables control by remote controller.
Input ON
→
OFF turns OFF unit.
Setting
Mode No.
FIRST CODE NO.
SECOND CODE NO.
FORCED OFF
12(22)
1
01
ON/OFF OPERATION
02
F2
T1
T2
FORCED
OFF
Input A
Fig. 30
4PEN468968-1C.book Page 22 Friday, March 24, 2017 1:30 PM
Содержание FAA100AUVEB
Страница 1: ...INSTALLATION MANUAL FAA71AUVEB FAA100AUVEB Split System Air Conditioner...
Страница 31: ......
Страница 32: ...4P468968 1C 2017 03 Copyright 2017 Daikin...